أحمد فياز, (1) PLANT SHIFT SUPERVISOR

أحمد فياز

(1) PLANT SHIFT SUPERVISOR

WAFRA POWER GENERATION PLANT

البلد
الكويت - الأحمدى
التعليم
ماجستير, Mechanical
الخبرات
25 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :25 years, 8 أشهر

(1) PLANT SHIFT SUPERVISOR في WAFRA POWER GENERATION PLANT
  • أبريل 2003 إلى مارس 2014

PROJECT: WAFRA POWER GENERATION PLANT - KUWAIT

PERIOD: 21 April 2003 - Until Present
(1) PLANT SHIFT SUPERVISOR: Plant Shift In-charge responsible for the following works: M/S Joint Operations (JO) had taken over the responsibilities of O&M of Wafra Power Generation Plant from April 21, 2003 from Siemens-Westinghouse Service Company (SWSC) . Following successful completion of my contract with SWSC, I continued to work at PGP Wafra with new employer JO. My responsibilities with JO continued to be same as under SWSC (mentioned on the next page)


ORGANIZATION: SIEMENS-WESTINGHOUSE POWER CORPORATION
PROJECT: WAFRA POWER GENERATION PLANT - KUWAIT
(A PROJECT OF JOINT OPERATIONS, SAUDI ARABIAN TEXACO AND KUWAIT OIL COMPANY)

(1) PLANT SHIFT SUPERVISOR في Westinghouse Distributed Process Family (WDPF)
  • الهند
  • يوليو 1997 إلى أبريل 2003

PERIOD: 01 July 1997 - 20 April 2003
(1) PLANT SHIFT SUPERVISOR: Plant Shift In-charge responsible for the following works: • Operations of Power Plant consisting of following equipments: Gas Turbines: Three Siemens-Westinghouse dual fuel fired units of 57 MW ISO each, W-501 AA Westinghouse Gas Turbine-Generator units with latest state of the art DCS, Westinghouse Distributed Process Family (WDPF)
Gas Compressors: Three DRESSER RAND make reciprocating Fuel Gas Compressors. Two single stage compressors of 29 MMSCFD capacities and one 3 stage compressor of 11 MMSCFD capacities.
DCS and PLCs: Westinghouse Distributed Process Family (WDPF) DCS for Gas Turbine and BOP Control and Allen Bradley PLCs for Gas Compressors control.
Black Start Gen-Sets: Three CATTER PILLAR Diesel Generators. Two gen-sets of 1.5 MVA each and one 2.4 MVA rating for auxiliary power supply to Black Start the station.
H2S and Combustible Gas Detection System: Centralized Hydrogen Sulphide (H2S) Gas and Combustible Gas detection system for the Combustion Turbine Units, Gas Compressors and rest of the plant area
Fire Protection System: FM200 Fire protection system for Combustion Turbine unit, Centralized Foam type Fire protection system for Fuel oil Storage Tank. Fire water pump house for hydrant system.
Electrical Distribution and Transmission: 13.8 KV, 4.16 KV and 480 V Cutler Hammer Switchgears for Station auxiliary power distribution and 34KV and 115KV power transmission system with step up ABB feeder transformers.
Fuel Gas Supply and Fuel Oil Storage: Filtering, compression and supply of pressurized Sour Natural Gas with 4% H2S content to the Combustion Turbines. Operations of John Zink Flare stack system. Also, unloading, storage and forwarding of the fuel oil to Combustion Turbines.


• Preparation of Plant Operations Reports: Shift Reports, Daily Generations Report, Monthly Generation reports, Blackout and Brownout Incident reports etc.
Develop Plant Procedures and Standard Operating Procedures like, Emergency Response Procedure, Confined Space Entry Procedure, Work Permit Procedure, Lock-out/Tag-out/Standard Isolations Procedure, Plant Black Start and Normal Start-Up Procedure, Normal and Emergency Shutdown Procedures etc as assigned by the Operations Superintendent.


ORGANIZATION: Ministry of Electricity and Water Kuwait. (MOE)

PLANT SENIOR SHIFT ENGINEER في ZOUR (South) POWER GENERATION PLANT
  • أكتوبر 1992 إلى يونيو 1997

PROJECT: AL- ZOUR (South) POWER GENERATION PLANT - KUWAIT
PERIOD: October, 1992 - June, 1997
PLANT SENIOR SHIFT ENGINEER
Plant Shift In-charge responsible for the Operation and controlling the following works:
Boilers and Auxiliaries: Toshiba Boilers with duel fuel firing (Gas/Distillate) facility.
Steam Turbines: Eight Mitsubishi Steam Turbine-Generator units of 300 MW each.
Gas Turbines: Four Mitsubishi Gas Turbine-Generator units of 30.00 MW each.
Desalination & Water Treatment Plant: Eight Water desalination Units of each 7 million gallons per day capacity. Chlorination plant etc.
Black Start Gen-Sets: Diesel Generators 3.0MW each and Four Gas turbine 30MW each.
Fire Protection System: Halogen Fire protection system for Plant and the Units, Centralized Foam type Fire protection system and Fire hydrant system.
HVAC System: Hitachi supplied Units of HVACS, Chillers, Air handling Unit and split units etc. The Control system was supplied by Honeywell.
• Preparation of Plant Operations Reports: Shift Reports, Daily Generations Report, Monthly Generation reports, Efficiency reports Blackout, Brownout Incident reports etc.
Develop Plant Procedures and Standard Operating Procedures like, Emergency Response Procedure, Work Permit Procedure, Lock-out/Tag-out/Standard Isolations Procedure, Plant Black Start and Normal Start-Up Procedure, Normal and Emergency Shutdown Procedures etc as assigned by the Operations Department.

MECHANICAL ENGINEER في Reko Trading Company, Egypt
  • نوفمبر 1990 إلى أبريل 1992

ORGANIZATION: Reko Trading Company, Egypt
ORGANIZATION: PERIOD: November 1990 -April 1992

As MECHANICAL ENGINEER responsible for Maintenance of Heavy vehicles, Steam pipelines etc.

PLANT SENIOR SHIFT ENGINEER في Ministry of Electricity and Water Kuwait
  • مارس 1989 إلى أغسطس 1990

ORGANIZATION: Ministry of Electricity and Water Kuwait. (MOE)
ORGANIZATION: PROJECT: AL- ZOUR (South) POWER GENERATION PLANT - KUWAIT
PERIOD: March 1989 -August, 1990
PLANT SENIOR SHIFT ENGINEER
Plant Shift In-charge responsible for the Operation and controlling the following works:
Boilers and Auxiliaries: Toshiba Boilers with duel fuel firing (Gas/Distillate) facility.
Steam Turbines: Eight Mitsubishi Steam Turbine-Generator units of 300 MW each.
Gas Turbines: Four Mitsubishi Gas Turbine-Generator units of 30.00 MW each.
Desalination & Water Treatment Plant: Eight Water desalination Units of each 7 million gallons per day capacity. Chlorination plant etc.
Black Start Gen-Sets: Diesel Generators 3.0MW each and Four Gas turbine 30MW each.
Fire Protection System: Halogen Fire protection system for Plant and the Units, Centralized Foam type Fire protection system and Fire hydrant system.
HVAC System: Hitachi supplied Units of HVACS, Chillers, Air handling Unit and split units etc. The Control system was supplied by Honeywell.
• Preparation of Plant Operations Reports: Shift Reports, Daily Generations Report, Monthly Generation reports, Efficiency reports Blackout, Brownout Incident reports etc.
Develop Plant Procedures and Standard Operating Procedures like, Emergency Response Procedure, Work Permit Procedure, Lock-out/Tag-out/Standard Isolations Procedure, Plant Black Start and Normal Start-Up Procedure, Normal and Emergency Shutdown Procedures etc as assigned by the Operations Department.

MECHANICAL ENGINEER في Ministry of Electricity, Egypt
  • يناير 1988 إلى فبراير 1989

ORGANIZATION: Ministry of Electricity, Egypt.

PERIOD: January 1988 -February 1989
As MECHANICAL ENGINEER responsible for Maintenance of Heavy
Light vehicles and equipments etc. in the Ministry.

GENERAL INFORMATION

TRAINING AND DEVELOPMENT PROGRAMMES ATTENDED: 1. Power Plant Operations and Maintenance conducted by Westinghouse Electric Company - 4 Weeks.
2. H2 S awareness training.
3. Introductory Training of new Work permits system in JO
4. HVAC system Operation and Maintenance training by Hitachi

COMPUTER APPLICATIONS KNOWLEDGE:
I have extensive hands-on working experience on the following software applications: 1. Mainsaver: Computerized Maintenance Management Software (CMMS) for PM and corrective Work Order execution, Spare parts management etc.
2. Tag-Link: Maintenance Safety Software (MSS) to process Log-out/Tag-out.
3. Microsoft Office: Computer Applications like MS-Word, Excel, MS- Project, and MS-Power Point etc.

الخلفية التعليمية

ماجستير, Mechanical
  • في Menofia University
  • يناير 1987

Graduate Engineer (Mechanical-Power) DEGREE / BOARD CERTIFICATE UNIVERSITY / COLLEGE YEAR OF PASSING BS- Mechanical Engineering Menofia University, Egypt 1987 -

Specialties & Skills

DIESEL GENERATORS
EMERGENCY RESPONSE
FIRE PROTECTION
GAS TURBINE
GAS TURBINES
OPERATIONS
SIEMENS
WESTINGHOUSE

اللغات

العربية
مبتدئ
الانجليزية
مبتدئ