أحمد حجاب, project manger-مدير مشروع

أحمد حجاب

project manger-مدير مشروع

بن دايل للمقاولات

البلد
المملكة العربية السعودية
التعليم
بكالوريوس, هندسة مدنية
الخبرات
25 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :25 years, 7 أشهر

project manger-مدير مشروع في بن دايل للمقاولات
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ يونيو 2015

Civil Engineer - Project manager 25 Years Experience In Government - Commercial and Residential Construction -and infrastructural Projects

مدير تنفيذي في بن دايل للمقاولات
  • المملكة العربية السعودية - الرياض
  • أشغل هذه الوظيفة منذ أبريل 2015

My key job responsibilities here include, Supervise the construction activities, Preparing workshop sketches for steel bars and bending list, Review contract drawings for constructability, manage and control the Quality Assurance plan to achieve the required quality, Review work schedule and participate in work plan input, Reviews and verifies subcontractor’s monthly invoice, Reported requirement for the manager to the area requirement (form work, manpower and pouring schedule), Reported the man power and the Equipments reports for the required and efficiency, Reported the actual work status report for the
actual complete percent for management.

Title: Project Executive Manager
Projects Description
Projects Data:
-project name: construction of Collage of Tourism and Antiquities
- Project location: king Saud University at Riyadh
- Project Components: Execution main Building & Spine and layout
- Period: 24 months
- Client authority: king Saud University
- Project Value: 95, 550, 000 SR
Maine Building Description: pre- cast (RDP el saif company LTD)
Architectural description:
- Area :7460.66 m2 (62.25*119.85 m ) each floor with Total high :18 m
- No of Floors :Ground floor &First Floor & second Floor & Upper roof
- Component; class rooms ‘lecture ‘labs’ mosque’ elect and mechanical rooms ‘ minster offices
Structural description: pre- cast
- Foundation System :Isolated &combined and stripe footing with retaining walls and shear walls
- Columns & beams : pre- cast(no of col 105 fixed by anchor pelts system - beam length 9.6 m)
- Slab System: hollow core system with 5 cm screed layer
- Shear walls & cladding walls and pre-cast walls for 4 elevators& elect -mechanical rooms fixed by dowels bares system and no of 4 pre - cast stairs & cast cantilever main satire
Lay Out Description:
- Project Area :62661.97 m2 (237.32m*264.04m )
- Barking area; 120 car bark ‘total area 13051 m2
- Concert Retaining wall; total length 443ml’ H 3m ‘W 30 cm ‘with stripe footing
- Storm water Chanel; total L 105 ml with concert box culvert and manhole
Academic Spine Description:
- Total L 120m ‘W 20 m ‘H 11.24 m (underground level 5.24 ground floor level 6 m )
- Foundation System :Isolated &combined &mesh raft and stripe footing with retaining walls
- Columns & beams : underground casting concert Columns & beams and pre- cast ground col
- Slab System ;flat Slab casting for grad slab and pre- cast slab for ground floor

Project Manager في رؤيا للتجارة والمقاولات
  • المملكة العربية السعودية - الرياض
  • فبراير 2009 إلى فبراير 2015

March 2009 to Till Now Company " ROIYAH Construction Company " From
Title: Project Construction Manager
Projects Description
Projects Data:
- project location : Dorat AL Mousa Planning in AL Shfa Quarter
- project Name :AL SHF Residinational Building Planning (B6)
- project Components : Execution 10 Residinational Building (130 unites )
- Period :36 months
- Client authority: ABDULAZIZ AL MOUSA REAL ESTATE INVESTMENT
- Project Value: 32500000 SR

Duties & Responsibilities included:
Review shop drawings of project and records the Notes .
Check and review Bills of quantities
Follow up and review the project procurement status;arranged with suppliers
Receiving supply materials according to required quantities &specifications
Monthly check imports & exports for materials in stores
Reviews and verifies subcontractor’s monthly invoice.
Review work schedule and participate in work plan input
Reported actual work status report for the actual complete percent for management
Reported requirement for head quarter to the project requirement
Manage and control the Project Quality Assurance plan..
Reported the man power & Equipments reports for the required and efficiency.
Organize with steel &concert factory before supply
My Achievement's in project:
- Finish my project according to planning schedule &general specifications
- Saving in architectural area of resident ional building (135 m2 ) by modified &
Re design architectural system
- Saving in quantities of materials not affect to specifications by :
- Re design structural drawings by following to design office saving R.C 183 m3&
steel 8407 K.G for each R.B
- Reduce building height from 3.60 m to 3.26 m saving concert, steel, materials
- Modified swag lines paths saving 160 m.l & 12 manholes
- Reduce the foundation depth from 2 m to 1.5 m by agreement with
consulting office to preparation of a general geo technical reports & site test.
Project Documents (Fills ) :

Daily Reports : execution items; labors;equipments;materials
Daily photos for each execution items &notes
Supplier materials invoices (Quantities;specifications )
Finantioal bondmaid Certificates of sub contracts (Quantities; values )
Finantioal contracts (suppliers & sub contracts )
Fills of Site test Results (soil compaction-R.C Test- Plumping pressure )
Imports &Exports Documents


March 2010 to 2012 AL Gasmyn Residential & Commercial Buildings (LA-LB-LC) From
Title: Project Construction Manager
Projects Data:
- Project location: AL QASEM ROAD (AL RYADH)
- Project Components: 3 lots Residential & Commercial Buildings (114 Apartments)
- Period: 24 months
- Client authority: ABDULAZIZ AL MOUSA REAL ESTATE INVESTMENT
- Project Value: 24, 300, 000 SR
From March 2009 to 2010 AL Ostool project (commercial &official) Building
Title: Project Construction Manager
Projects Description
Projects Data:
- Project location: AL DAMAM Road (al kadesaia zoon)
- Project Components: Execution 6 shops & 24 offices & 94 parking
- Period: 12 months
- Client authority: ABDULAZIZ AL MOUSA REAL ESTATE INVESTMENT

Project Manager في Company " KFB group "
  • المملكة العربية السعودية - الرياض
  • يناير 2007 إلى يناير 2009

From Jan 2007 to 2009 Company " KFB group "
Title: Project Construction Manager
Projects description: Extension of AL MALAZ prison project
Consists of execution of 2 new buildings in Al MALAZ Prison with project duration 30 Months, , for 4 floors; building with area 2800 m2 each floor
Client authority: general management of prisons
Consultant: specials Saudi for projects management's office
Project Value: 18, 320, 000 SR
Duties included: • Review work schedule and participate in work plan input
• Reviews and verifies subcontractor's monthly invoice.
• Reported requirement for head quarter to the project requirement
• Follow up and review the project procurement status.
• Reported the man power & Equipment's reports for the required and efficiency.
• Reported actual work status report for the actual complete percent for management

Project Manager في MOHAMED ALI AL SWILAM
  • المملكة العربية السعودية - الرياض
  • يوليو 2003 إلى ديسمبر 2006

From Jul 2003 to Dec 2006 "MOHAMED ALI AL SWILAM company "
Title: Project Construction Manager
Projects description: -
Construction 2 girl schools (pre cast system)
Client authority: management of girl's education
Consultant: architectural office for engineering Consultant
Project data: duration 24 months;3 floors for each school; area 1600 m2 each floor; each school
component of 22 class room;10 offices;electric room; 3collected bathrooms; water tank;
swage tank; boundary wall
Project Value: 12, 850, 000 S.R

Projects description: -

Site Engineer في Al SAWAY EST
  • المملكة العربية السعودية - بريدة
  • فبراير 2002 إلى مايو 2003

'

Site engineer في Alexandria Company
  • مصر - القاهرة
  • أغسطس 1998 إلى يناير 2002

• Review shop drawings of project and records the Notes.
• Check and review Bills of quantities
• Follow up and review the project procurement status;arranged with suppliers
• Receiving supply materials according to required quantities &specifications
• Monthly check imports & exports for materials in stores
• Reviews and verifies subcontractor’s monthly invoice.
• Review work schedule and participate in work plan input
• Reported actual work status report for the actual complete percent for management
• Reported requirement for head quarter to the project requirement
• Review work schedule and participate in work plan input
• Manage and control the Project Quality Assurance plan..
• Reported the man power & Equipments reports for the required and efficiency.
• Organize with steel &concert factory before supply

الخلفية التعليمية

بكالوريوس, هندسة مدنية
  • في كلية الهندسة جامعة الزقازيق
  • أغسطس 1998

بكالريوس هندسة مدنية سنة التخرج ١٩٩٨

Specialties & Skills

Site Engineering
Management
civil engineer
AutoCAD
Construction Engineering
AUTOCAD
project manager civil eng
QUALITY ASSURANCE

اللغات

العربية
متمرّس
الانجليزية
متمرّس

العضويات

الهيئة السعودية للمهندسين
  • مهندس مدني
  • January 2010
معتمد مهندس مدني من ادارة المشاريع بادارة تعليم البنات- وزارةالتعليم
  • مهندس مدني
  • May 2003
جامعة الملك سعود بالرياض - ادارة المشاريع
  • مهندس مدني
  • April 2015

الهوايات

  • sprtes & reading