Workshop Engineer
Al-Bergasy Group
Total years of experience :11 years, 1 Months
Diagnose the faults indicated by customers and put-up the recommendations.
Provide technical guidance and monitor daily work schedule for technicians.
Avoids unnecessary replacement of spare parts.
Ensures that proper maintenance is carried out on vehicles.
Inspects & test drives vehicle on which repairs are performed.
Returns those vehicles failing the quality control inspection to the technician who performed work and assist him to solve the problem.
Conducts OJT for workshop engineers group.
Responsibilities:
1- Review and analyze stock and operational plans for ensuring adequate stock availability of all products.
2- Make the spare parts stock order.
3- Advises on current and future in market sales against business targets/forecasts from past trends.
4- Create Purchase Orders on local / foreign vendors.
5- Report weekly, monthly, and annually, to the brand manager fast and slow moving items.
Advise customer about necessary service for routine maintenance.
Help identify a mechanical problem by questioning the customer or doing a visual inspection or road test
Follow & implement Service Advisor Steps:
o Appointment
o Reception
o Writing-up repair needs.
o Monitoring work in progress
o Final check for delivery.
o Job explanation at delivery.
o Post service follow-up.
Handle customer complaints
Provide professional advice to customers on vehicle maintenance.
Orders and follows up parts orders with Parts Department
Responsibilities:
1- Diagnose the faults indicated by customers and fix it.
2- Provide technical guidance and monitor daily work schedule for technicians.
3- Avoids unnecessary replacement of spare parts.
4- Ensures that proper maintenance is carried out on vehicles.
5- Inspects & test drives vehicle on which repairs are performed.
6- Returns those vehicles failing the quality control inspection to the technician who performed work and assist him to solve the problem.
Responsibilities:
1- responsible for Health, Safety & Environment in the site.
2- Establish a HSE Management System that is compliant with OHSAS 18001:2007.
3- Conduct pre-operational risk assessments on new sites and design risk mitigation measures
3- Monitor HSE controllers in executing continuous audits
4- Follows up to ensure that corrective actions are implemented
4- Handling the working schedule by the work permit.
5- Dealing with Accident with the following: Accident Investigations, Accident Report and precaution action.
6- Maintaining, documentation and Inspect equipment used by Employees.
• Achievements:
Conduct the suitable health and safety environment for work in these sites
- DEO “ German school in Cairo” Doki st., Doki, Cairo, Egypt.
- EGYAIR Hospital, Almaza, cairo, Egypt.
- UNB "United National Bank", gamet el-dewal st, Cairo, Egypt.
- Design safety Plan for "Al-Ahli bank south tower", Corniche el-nile, Cairo, Egypt.
- Rkw “German Plant produce of plastic products, Samy saad industrial zone, 6 october city, Egypt.
- GNP “Global NAPI Pharmaceuticals, 2nd industrial zone, 6 october city, Egypt.
- Universal new plant, 4th industrial zone, 6 october city, Egypt.
- El-Araby mall, After zaid 2000 entrance, sheikh zayed city, Egypt.
- Pharma pack, 3th industrial zone, 6 october city, Egypt.
- Horus "EVA Pharma new plant", Samy saad industrial zone, 6 october city, Egypt.
Responsibilities:
1- Design of firefighting and plumbing systems according to American codes "NFPA" and "National Plumbing code"
2- Make value engineering for systems & reduce cost
3- Business Development.
Achievements:
Fire fighting Projects :
1- Porto South Beach, Suez Amer Group phase ( h1 to 15 & ru1 to 4 )
2- Nemar Site, Riyadh, KSA
3- ocean blue sohna, New Cairo, Eygpt
4- ocean blue HEILIOPLIS, Autostrade, New Cairo, Eygpt
5- karbala Hall, Bagdad Airport, Iraq
6- Gabal El-zete 200MW wind farm 125MVA 220/22 GIS substation
7- Iskan el shabab, Menofia including :-
- El bora3y building
- culture centre building
- El shohda building
- Katkoot building
- Talia ashmoon building
8- Capital mall, Menoufia, Egypt
Plumbing Projects :
1- Iskan el shabab, Menofia including :-
- Katkoot building
- Model 1
- Model 2
- Model 3
2- Mohamed morsy villa, 6th October
3- Asem al khudary villa, 6th October
4- Mahamed salah 3ayad villa, 6th October
Strategic engineering Management Lean Six Sigma Project Management Total Quality Management Supply Chain engineering Management Risk Management Professional Marketing Management for Engineers Human Resources Management for Engineering & Manufacturing Industry Accounting and Financial Management Administration and Engineering Management Entrepreneurship
study five branches 1- management 2- human resources 3- marketing 4- quality control 5- financial
Engineering university