عمرو Abd-Elaah, Senior Electrical Engineer

عمرو Abd-Elaah

Senior Electrical Engineer

National Contracting Company NCC

البلد
مصر - القاهرة
التعليم
بكالوريوس, Electrical Engineer
الخبرات
12 years, 7 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :12 years, 7 أشهر

Senior Electrical Engineer في National Contracting Company NCC
  • مصر - القاهرة
  • أشغل هذه الوظيفة منذ مارس 2017

A‐General:
 Working with the assistance of Civil and Architecture Subcontractor on the
Substation General Layout.
 Designation of the Cable raceways
 Performing the Earthing Calculation for the Substation
 Designing the Substation Earthing Grid
 Designing the Shielding from the Lightning for the substation
 Preparation the Bill of Quantity for all of above
 Preparing all RFQ of Electrical Installations and Suppliers.
 Supplier inspection for different material testing and reviewing.
 Site Inspection for insuring and explanation of different submittals.
B‐Projects:
 Assuit Super Critical Power Plant 1 X 650 MW‐ 500kV GIS Switchyard

Design Engineer في ElSewedy PSP
  • مصر - القاهرة
  • مارس 2016 إلى مارس 2017

A‐General:
 Working with the assistance of Civil and Architecture departments on the
Substation General Layout
 Designation of the Cable raceways of the H.V. and M.V. cables for the Substation
 Designation of the raceways for the Control cables
 Performing the Earthing Calculation for the Substation
 Designing the Substation Earthing Grid
 Designing the Shielding from the Lightning for the substation
 Preparation the Bill of Quantity for all of above
 Create 3D model for the Raceway by using Different Software.
 Site Inspection for insuring and explanation of different submittals.
 Supplier inspection for different material testing and reviewing.
B‐Projects Achieved:
 Bani Suef Combined Cycle Power Plant (4800MW).
 Manshiat Nasser 220/66/11KV substation.

Design Engineer في Jawda Engineering Consultant
  • مصر - القاهرة
  • أبريل 2014 إلى فبراير 2016

A‐General:
 Working with the assistance of Civil and Architecture departments on the
Substation General Layout
 Designation of the raceways of the H.V. and M.V. cables for the Substation
 Designation of the raceways for the Control cables
 Performing the Earthing Calculation for the Substation
 Designing the Substation Earthing Grid
 Designing the Shielding from the Lightning for the substation
 Preparation the Bill of Quantity for all of above
B‐Projects Achieved:
 AL‐MOTAMARAT S/S 110/13.8 KV (western)
 MODON‐2 S/S 110/33/13.8 KV (western)
 Al‐LAITH s/s 110/13.8 KV (western)
 ADAM S/S 110/33 KV (western)
 SUFFA S/S and RUFFIDAH S/S Extensions (southern)
 MUNA‐4 S/S 110/13.8KV (western)
C‐Projects Involved In:
 Gulf Salman 110/13.8KV (western)
 Jeddah Seaport 110/13.8KV (western)
 Dahart Allban 132/13.8KV (Central)
 Mokhtarah 110/33KV/13.8KV (Southern)
 Najran 110/33KV/13.8KV (Southern)
 Sised extension 110/13.8KV (western)
 Uqlat Al‐soqor Reinforcement 110/13.8KV (Central)
 Al‐Naga extension 110/13.8KV (western)

Officer في Armed Forces
  • مصر - القاهرة
  • أكتوبر 2011 إلى مارس 2014

Worked at the Armed Forces for the Air Defense Forces for two years as an
Officer (October 2011  March 2014)
Duties Executed:
1‐ Managerial handling of soldiers
2‐ Maintenance of Electrical control systems

الخلفية التعليمية

بكالوريوس, Electrical Engineer
  • في Ain Shams University
  • يوليو 2011

Electrical Power and Machines Engineering Bachelor Degree from Faculty of Engineering, Ain Shams University with an overall grade Very Good

Specialties & Skills

Electrical
Auto Cad
Lightning Protection System Design
Grounding System Design
Cable management System

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس
الايطالية
مبتدئ

الهوايات

  • Reading, Football, Sports