Total Years of Experience: 17 Years, 5 Months
July 2013
To Present
Operational Coordinator
at Carillion Alawi LLC
Location :
Oman - Muscat
Responsibilities:
Working as MEP Operational Coordinator and leading a team of 15 to 20 People
Responsible for the reactive and planed preventive maintenance
Responsible to insure PPM of 3 phase induction motors, UPS, Switchgear, Lighting, D.B & Generators
(Monthly, 6 monthly & yearly)
Responsible to insure health and safety as per PDO norms during work
Managing Electrical Shutdown as per PDO schedule
Using GENEVA and SAP software for print out scheduling wise PPM, and reactive job cards.
Follow up outstanding reactive jobs with our subcontractor’s.
Monitoring team and vehicle through IVMS system.
Working as MEP Operational Coordinator and leading a team of 15 to 20 People
Responsible for the reactive and planed preventive maintenance
Responsible to insure PPM of 3 phase induction motors, UPS, Switchgear, Lighting, D.B & Generators
(Monthly, 6 monthly & yearly)
Responsible to insure health and safety as per PDO norms during work
Managing Electrical Shutdown as per PDO schedule
Using GENEVA and SAP software for print out scheduling wise PPM, and reactive job cards.
Follow up outstanding reactive jobs with our subcontractor’s.
Monitoring team and vehicle through IVMS system.
October 2010
To April 2013
Electrical Technician
at Gulf Engraining Service
Location :
Pakistan - Multan
Preventive maintenance of medium and low voltage motors. Maintenance & overhauling of 11KV motors. MV motors up to 3MW and LV 380v motors up to 200KW, Overhauling, Termination, rotor and stator cleaning Heating, Meggering, and bearing replacement
• Generator Connection Checking and replacement to Carbon Brushes.
• Generator General Type Bearing Replacement.
• Inlet and Outlet Oil Line Leakage test.
• Rotor & Generator all electrically test.
Winding resistance measurement
Insulation resistance measurement
Polarization index test
Power factor tip-up test
Dissipation factor test
Partial discharge test
• Generator Hydrogen Lines Leakage Test.
• Generator Cooler Cleaning and Leakage Test.
• Excitation Transformer Electrically Test.
• Excitation Panel cleaning and testing with DC Breaker.
• Surge Arrester of Generator Panel Cleaning and Electrically test.
• Turbine HP, IP, LP Upper & Lower Diaphram Seals Replacement.
• DC Distribution Panel Maintenance.
• MCB Breaker, 3 Pole & 2 Pole, Timer, Relays, D.C H.R.C Fuse Kit, D.C Coupler Box Cleaning Maintenance Continuity Test & Mage ring.
• DC Bus Bar Lose Checking.
• Cable Insulation test with continuity test.
• Isolator cleaning and Isolator Panel test with 110V DC Motor.
• Operate the Isolator Manually & Automatically.
• SF6 Circuit Breaker Panel Cleaning & Maintenance.
• SF6 Compressor Motor Checking & Mage ring.
• Change the Oil Compressor Pump.
• AC Distribution Panel checking and cable insulation test.
• Power & Control Cable Laying
• PC & CC Cable Continuity Test & Short Circuit Test
• Power & Control Cable Gladding,
• MCC Panel Installation & Termination.
• Power & Control Cable Termination.
• 11 KV VCB panel Install & Termination.
• DC Motors Install, Termination & Commissioning.
• Cooling Bed Inlet & Outlet DC Motors Install & Termination.
• Generator Connection Checking and replacement to Carbon Brushes.
• Generator General Type Bearing Replacement.
• Inlet and Outlet Oil Line Leakage test.
• Rotor & Generator all electrically test.
Winding resistance measurement
Insulation resistance measurement
Polarization index test
Power factor tip-up test
Dissipation factor test
Partial discharge test
• Generator Hydrogen Lines Leakage Test.
• Generator Cooler Cleaning and Leakage Test.
• Excitation Transformer Electrically Test.
• Excitation Panel cleaning and testing with DC Breaker.
• Surge Arrester of Generator Panel Cleaning and Electrically test.
• Turbine HP, IP, LP Upper & Lower Diaphram Seals Replacement.
• DC Distribution Panel Maintenance.
• MCB Breaker, 3 Pole & 2 Pole, Timer, Relays, D.C H.R.C Fuse Kit, D.C Coupler Box Cleaning Maintenance Continuity Test & Mage ring.
• DC Bus Bar Lose Checking.
• Cable Insulation test with continuity test.
• Isolator cleaning and Isolator Panel test with 110V DC Motor.
• Operate the Isolator Manually & Automatically.
• SF6 Circuit Breaker Panel Cleaning & Maintenance.
• SF6 Compressor Motor Checking & Mage ring.
• Change the Oil Compressor Pump.
• AC Distribution Panel checking and cable insulation test.
• Power & Control Cable Laying
• PC & CC Cable Continuity Test & Short Circuit Test
• Power & Control Cable Gladding,
• MCC Panel Installation & Termination.
• Power & Control Cable Termination.
• 11 KV VCB panel Install & Termination.
• DC Motors Install, Termination & Commissioning.
• Cooling Bed Inlet & Outlet DC Motors Install & Termination.
May 2010
To August 2010
Electrical Forman
at SMC (S Mechanical Company) LLC Qatar
Location :
Qatar - Doha
MICC (Mineral Insulated Clad Cable) lying & Termination Install the 25mm conduit (Bending, cutting, joint & fitting), Pulling the wire & install the florescent lighting, 2D lights. Install D.B and use MCCB, RCD, and ELCB.Cable Gland and Termination LV/HV Switch Rooms.
January 2007
To November 2008
Electrical Technician
at Dost Still Mill Ltd.
Location :
Pakistan - Lahore
Attend the jobs of installed electrical equipment with Testing & Commissioning. Electric LV/ HV Panels, Three Phase & Single Phase wiring, Maintenance Lighting System, LT panels of power house, Installed the Three Phase & Single Phase Motors with D.O.L Starter, Star Delta, Reverse & forward Starter, Installed the D.C Motor, Installed the VCB, ACB, MCC Panels with Termination & Commissioning, worked at cable tray fixed, Cable pulling, Fixed the Conduit wiring, Performed Control Circuit Wiring and Modification on MCC and PCC as per the original drawing / site / Process requirements.
January 2006
To December 2007
Electrical Technician
at WAPDA
Location :
Pakistan - Multan
Responsibilities:
Maintenance single & three phase motor. Rewinding single phase motors and pumps
Maintenance work in switch yard, maintenance and cleaning in SF6 circuit breaker with insulator &isolator Testing (manual and automatic operate SF6, change oil SF6 compressor pump) as per as the Electrical Safety rules with PTW System.
Maintenance of the Plant area Lighting (change & Replace fuse lights with safety)
11 KV (VCB) Switchgear panel Annually Maintenance (Electrical test, replace expire VCB bottles & cleaning) all work as per LOTO system.
Protective and corrective maintenance of Power generation equipment including 220 MW Generators
Look after Operation and Maintenance work of Indoor, Outdoor Lighting Protection System
Maintenance single & three phase motor. Rewinding single phase motors and pumps
Maintenance work in switch yard, maintenance and cleaning in SF6 circuit breaker with insulator &isolator Testing (manual and automatic operate SF6, change oil SF6 compressor pump) as per as the Electrical Safety rules with PTW System.
Maintenance of the Plant area Lighting (change & Replace fuse lights with safety)
11 KV (VCB) Switchgear panel Annually Maintenance (Electrical test, replace expire VCB bottles & cleaning) all work as per LOTO system.
Protective and corrective maintenance of Power generation equipment including 220 MW Generators
Look after Operation and Maintenance work of Indoor, Outdoor Lighting Protection System