Binoj k s, Site Engineer-Steel Structure Erection

Binoj k s

Site Engineer-Steel Structure Erection

Green Spring Group Co.,Kuwait

Lieu
Inde
Éducation
Baccalauréat, Mechanical
Expérience
16 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 4 Mois

Site Engineer-Steel Structure Erection à Green Spring Group Co.,Kuwait
  • Koweït
  • Je travaille ici depuis février 2012

 Erection of steel structures as per approved erection drawings.
 To manage and supervise all the work done in site and maintain the quality of work.
 Handle the task of maintaining contract drawings and updating issues at the construction site to the project manager.
 To support the provision of the work environment to subordinates and subcontractors by issuing proper materials, tools and safety equipment.
 Coordinated with the inspectors on site for keeping process ongoing.
 Interaction with clients regarding work progress.
 Preparing program plans for client and sub contractors.
 Process, online, fit up stage, dimensional inspections.
 Supervise work progress, quality and HSE conditions.
 Prepare reports for day to day results and present them in weekly review meetings of both the
Company and client.

Projects Handled
1.New booster station BS 132 and enhancement to BS 131(Kuwait Oil Company, KOC)
2.Kuwait Police College, (Ministry of Public Works)
3.Al Sedeeq Neighborhood Center, (Ministry of Public Works)
4.Az- Zour Power Plant (Ministry of Electricity and Water, MEW)

Assistant Manager-Projects à BESL Infra Projects Limited, Cochin, India
  • Inde
  • mars 2011 à janvier 2012

 Facilitated smooth execution of projects by attending regular progress meetings with clients and sub contractors.
 Identified, and resolved field problems quickly and diplomatically thus saving time and money for the company.
 Production planning/ Daily/ weekly/ monthly.
 Co-ordination with purchase dept. / inspection parties/ clients/ etc.
 Responsible for all fabrication activities.
 Structural steel fabrication of 4000MT weighted pipe rack.
 To ensure that work is being carried out according to the project plan and priority list by client.
 Billing and ensuring the cash flow.

Projects Handled
Paradip Refinery Project, LSTK-Package-C
Indian Oil Corporation Limited(IOCL), Orissa, India

Site In Charge –structural à Pressteel Engineers & Consultants, Mumbai, India
  • Inde
  • août 2009 à février 2011

 Supervising all fabrication and erection activities & coordination with site management activities.
 Monitoring projects with respect to budgeted cost, demand forecasts, time over-runs to ensure timely execution of projects.
 Planning subcontractor’s activities and monitoring the progress.
 Supervise work progress, quality and HSE conditions.
 Interaction with clients regarding work progress.
 Arrange meetings with engineers and supervisors for the works going on.
 Arrange materials required on the basis of DMR.
 To plan, schedule and allocate daily maintenance workload to the section Technicians.

Projects Handled
Kochi Regas Facilities (Petro net LNG Limited, Puthuvypeen, Cochin, Kerala)

Site Engineer- Structural à Tech sharp Engineers Private Limited, Chennai, India
  • Inde
  • janvier 2008 à août 2009

 Modification of existing prefabricated structures.
 Structural steel fabrication and erection of pipe rack, pipe supports, equipment supports, truss etc.
 Fit up checking and weld visual checking as per drawings and specifications.
 Supervise work progress, quality and HSE conditions.
 Arrange tools and materials required.
 Preparation of RA Bill and reporting site progress to Project In Charge.

Projects Handled
CDU/VDU II, Revamp (CEMP II) Shut Down
Bharath Petroleum Corporation Limited (BPCL) - Cochin, Kerala

Éducation

Baccalauréat, Mechanical
  • à St. josephs college of engineering and technology
  • novembre 2007

Specialties & Skills

Site Engineering
Project Management
project/Site management

Langues

Anglais
Expert