During my work I passed with the department through the following projects & targets ….
• Recover a lot of the construction problems .
o Emergency lighting installation
o Master key plan design & installation .
o Total snagging for the entire site.
o Install new sensors for electric saving in building corridors .
• Engineering Filling System
Water quality log books
As built drawings - catalogs
Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
Preventive Maintenance Checklists
• Work with saving cost programs in Electricity for public area
• Go in deep in all of the Hotel Projects during the low season periods
o Total electric maintenance for street lighting
o Handrails renewing in all the site.
• Engineering Department operation
o Managing the operation tasks through the supervisors & technician
o Modifications calculations
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Daily report preparation .
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
Putting the aim to have loyal Staff
Deal with the Last Period in Egypt with Stable Engineering Department
During my work I get a lot of experience in a lot of fields & projects ….
• Prepare total renew / maintenance plan for all the hotel to get the engineering systems matching with the Hotels standard and cover a lot of construction problems
o Fire alarm / Fighting system
o Air condition system “Chiller - AHUs - Split Units - Hoods ”
o Kitchen Equipments
o Electric Distribution system “ Medium - Transformers - Earthing - …”
o Sewage system “sewage plant - sewage man halls ”
o Domestic Water system
o Hot water system “Hot water Boiler - Electric heaters - calorifiers ”
o Swimming Pools “pumps - filters - heat exchangers ”
• Engineering Filling System
o Total Engineering Filling System Creation
Water quality log books / Leganila disinfection protocol filing
Elevators -kitchen equipments - data and service visits
As built drawings - catalogs
Travel life environmental file
Fax in /out - …..etc
o Prepare & implement total maintenance checklists
Daily Checklist / Log books “ Pluming -Electric - Air Condition - Equipment ”
Preventive Maintenance Checklists
• Work with saving cost programs “Water - Electricity - etc…”
• Working with external auditors
o Hygiene consultant “Crystal Co.”
o Environment Consultant “Travel Life ”
• Go in deep in all of the Hotel Projects during the low season periods
• Managing the Engineering Department
o Putting Safety ”Human/Assets” in the first priority
o Keeping Guest Satisfaction on Department Goal
o Keep Assets Efficiency .
o Manage External Companies Issues
o Manage Engineering Team
Putting the aim to have loyal Staff
Deal with the Last Period in Egypt with Stable Engineering Department
"The Palace Hotel" As a Maintenance Engineer
During me work I get a lot of experience in a lot of fields & shared in a lot of projects ….
• Prepare a preventive Maintenance Plan for a very complicated site, according To IHG standard.
• Created all the maintenance check lists “daily checks - weekly -monthly-3 monthly - …. etc” check lists for all site equipments, follow up the PM Implementation.
• Follow up all the utilities consumption - according to IHG Standard -on daily basis-.
• Prepare & Work with water quality book according to IHG requirements.
• Create escape plane -room door escape plan- for the hotel.
• Work with all electromechanical & architecture drawing.
• Work with the Ken Fix Program.
• Work with saving cost programs “water - electricity ….”.
• Work with the electric earth protection in the rooms & equipments.
• Working with hygiene consultant “Crystal Co.”
• Working with water Quality consultant “House Man Co.”
• Working according to FLS requirements.
• Design a plastic mold "Simple molds"
• Design sheet metal dies "Cutting Dies"
• Spare parts Design
• Medical lines Requirement Design
• Reverse Engineering
• Using CAD-CAM-CAE systems " Unigraphics NX4.0"
• Create company Introduction presentation
• Case Study for projects "design view"
- I was CNC engineer "Wire & Milling M/C".
- plastic mould “injection & extortion ” Maker
CAD / CAM Engineer For wire cut M/C
- create 3D drawing using CAD Soft "Solid Edge"
- Create 2D Wire Cut CAD file using AutoCAD
-Create Wire Cut Cam file Using ESPrit Soft Ware
Degree: Bachelor degree in Mechanical production engineering. * University: Helwan University. * General grade: Acceptable. * Project: Design & Manufacturing of plastic mold for Thread and nut. * Project grade: Discriminate. * Graduate year: 2004.