Farid Najari, Maintenance Senior Engineer Planner

Farid Najari

Maintenance Senior Engineer Planner

Arya Sasol

Location
Iran - Tehran
Education
Doctorate, Industrial Engineering & Management
Experience
16 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 4 Months

Maintenance Senior Engineer Planner at Arya Sasol
  • Iran - Tehran
  • My current job since January 2008

Preparation of WBS & progress measurement system (PMS) based on contract; define stages for activities progress and quantity measurement.
Preparing different periodical and case reports include Progress& Cost Status, Quantity Curves& Reports, Schedule Review Report, ...
Raise work orders within the ERP for CM Corrective maintenance Work Order
Coordinate with the maintenance and operations team in the management of the maintenance daily work activities
Provide operational input into modification projects
Progression of the planned and unplanned work orders through planning and work stages to completion
Coordination of materials associated with work orders
Update work orders for actual labor craft, work class, scheduling time and date, work condition
Using Document and Warehouse during planning activity
Create, amend or cancel Preventive Maintenance schedule or work orders by raising Management Of Change (MOC) forms as required
Coordinate all active MOC forms for review, approval, authorization, implementation and finally completion
Participate in the improvement of ERP by attending clients meetings for changing awareness
Prepare ahead plans in MS Project for maintenance and operation works
Advise material specification of pipe works, tanks, and vessels

Education

Doctorate, Industrial Engineering & Management
  • at Kharazmi university
  • December 2018

First mentioned the combination of selected techniques for the resolution steps after collecting data. In the first technique, AHP-G, the final weight of the failure probability and the consequences of failure for each asset were identified. Second step was to evaluate to prioritize all possible failure modes in order to finally choose the most appropriate maintenance strategy for each failure mode. The techniques selected for this evaluation were three WASPAS-G, MULTIMOORA-G, and EDAS-G techniques, because these techniques are a fast and functional way of HMCDM. In the third step, the optimal maintenance and repair strategy was performed for each of the failure modes using the three techniques TOPSIS-G, COPRAS-G, ARAS-G.

Master's degree, Industrial Engineering & Management
  • at Tehran Polytechnic University
  • October 2012

In this treatise, systems that were repairable and non-repairable were separated using the system boundaries. By demonstrating that MFOP is a reliable metric relative to MTBF, it has been shown that the concept of MFOP not only succeeds in the petrochemical field but also can add measurable value in terms of optimizing maintenance activities.

Bachelor's degree, Industrials Engineering -Production Industry
  • at Shomal University
  • September 2004

Studied books of Industrial Engineering and learned of beleow skills: Analytical Skills · Statistical Data Analysis · Ergonomics · Statistical Process Control (SPC) · Research and Development (R&D), Operation Research

Specialties & Skills

Primavera P6
Schedule Planning
Plant Maintenance
Project Planning
Maintenance Planning
PRIMAVERA & MS Project & MS Office
Maintenance Planning
Project Execution
Materials Management
Maintenance Engineering
Maintenance Management
Cost/Budget Monitoring & Control
Resource Planning & Forecasting
EPC Project
Progress Monitoring & Control
Project Planning & Scheduling
Delay Analysis, EOT& Claim
Critical Path Analysis & Recovery Plans
Performance Measurement using EVM

Social Profiles

Languages

English
Expert
Persian
Expert
Azerbaijani
Expert

Memberships

ARYASASOL POLYMER COMPONY
  • PETROCHEMICAL
  • December 2008

Training and Certifications

Project Management Professional (PMP) Certificate Course (Training)
Training Institute:
Fan Pardaz
Date Attended:
August 2008
Duration:
58 hours
Physical Asset Management (Certificate)
Date Attended:
June 2015
Primavera (Certificate)
Date Attended:
August 2010