مجموع سنوات الخبرة: 24 سنوات, 3 أشهر
يناير 2013
إلى حتى الآن
Assistant Manager in Plastics Division
في Avnash Industries Ghana Ltd
البلد :
غانا
Responsible for various preforms production and bottles blowing.
Responsible for parameter optimizing in order to get excellent QC approve production for various preforms & bottles.
Responsible for various bottle moulds production & in-house preventive maintenance of moulds.
Handling various multi cavity moulds of preforms and caps.
Experts in handling preventive and breakdown maintenance of machine.
Responsible for designing standard operating procedure for different activity on shop floor.
Responsible for in-house operators training & shop-floor management.
Involve in designing checklist for utility accessories.
Responsible for parameter optimizing in order to get excellent QC approve production for various preforms & bottles.
Responsible for various bottle moulds production & in-house preventive maintenance of moulds.
Handling various multi cavity moulds of preforms and caps.
Experts in handling preventive and breakdown maintenance of machine.
Responsible for designing standard operating procedure for different activity on shop floor.
Responsible for in-house operators training & shop-floor management.
Involve in designing checklist for utility accessories.
أبريل 2009
إلى ديسمبر 2012
HOD injection Division
في General Plastics
البلد :
كينيا
Handled activities with the team of 20 maintainers as it’s a 24* 365 days running industry with approximately 46 Injection Machines.
Successfully implemented Kaizen tools on production floor.
Well experienced in Thin Wall containers & multi cavity moulds.
Handled primary level mould maintenance in shop floor
Successfully implemented Kaizen tools on production floor.
Well experienced in Thin Wall containers & multi cavity moulds.
Handled primary level mould maintenance in shop floor
أبريل 2008
إلى أبريل 2009
Associate Consultant
في Datamatics Ltd
البلد :
الهند - مومباي
Handled planning of maintenance to achieve Zero breakdown.
Got Trained on KAIZEN implementation on production floor.
Handled preventive and breakdown maintenance
Got Trained on KAIZEN implementation on production floor.
Handled preventive and breakdown maintenance
أكتوبر 2004
إلى يناير 2008
: Production cum Maintenance Eng.
في Mace Industries Nigeria Ltd
البلد :
نيجيريا
Handled the preventive and breakdown maintenance of the M/C and maintaining the schedule of maintenance.
Handled the preventive maintenance of generator set like changing and Servicing Air filter, Oil filter, and Fuel filter on Caterpillar 365 kva. 110 kva, 40 kva, Deutz 27 kva.
Handled the preventive maintenance of generator set like changing and Servicing Air filter, Oil filter, and Fuel filter on Caterpillar 365 kva. 110 kva, 40 kva, Deutz 27 kva.
يوليو 2002
إلى أغسطس 2004
production maintenance engineer
في Kane em Industries Ghana Ltd
البلد :
غانا
Assisting in day to day production & handled all type of preventive & breakdown - hydraulic, electrical and Mechanical & pneumatic maintenance of those M/C
Handling preforms & bottles production.
Involve in process optimization & mould in house maintenance.
Involve in men power planning and handling.
Handling preforms & bottles production.
Involve in process optimization & mould in house maintenance.
Involve in men power planning and handling.
أغسطس 1999
إلى مايو 2002
Shift Engineer
في Cello Plastotech
البلد :
الهند
Handled the shift individually and looking after day to day Production activity like mould loading & unloading, product setting etc.
Taking production of about 200 moulds of household articles like Bucket \[5 litter to 30ltr\] baskets, basin, trolley treys, air tight containers and hot runner and typical hydraulic and self-ejector moulds.
Setting cycle time to get the optimum production without Compromising with the quality of the product.
Taking production of about 200 moulds of household articles like Bucket \[5 litter to 30ltr\] baskets, basin, trolley treys, air tight containers and hot runner and typical hydraulic and self-ejector moulds.
Setting cycle time to get the optimum production without Compromising with the quality of the product.
انشر على فيسبوك
انشر على تويتر
مشاركة عبر البريد الإلكتروني