Muhammad Hassan FEHMI, Resident Engineer

Muhammad Hassan FEHMI

Resident Engineer

National Engineering Bureau

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Civil Engineering
Expérience
20 years, 2 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 2 Mois

Resident Engineer à National Engineering Bureau
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis septembre 2014

Manage the operational activities of the given projects to include but not be limited to: Contractors, Sub-contractors and Material Supplier etc. Co-ordination with client representatives and local authorities to secure approvals.
Supervise, monitor and report project progress throughout the project cycle to ensure on time completion.
Manage the correspondence with the client and the contractors regarding the progress, program, evaluation, variations, extension of time and claims.
Assess variations and report to the head office for decision making. Never make decisions on behalf of the client or ARC on issues related to commercial which requires the client’s written commitment.
Prepare minutes of meetings and write technical and progress reports.
Check the milestones and response to contractor’s letters as stipulated in the contract.
Ensure the implementation of Quality management system that complies with standard ISO 9001 - 2008. Ensure that policies and procedures are being adhered to at all times.
Assess the progress of work on site and certify payment as per the contract documentations.
Attend co-ordination meetings with Contractor, Subcontractor, client etc. Ensure all meetings are documented.
Negotiation and preparation of documentation for change. Review and evaluate change order request or claim. Prepare Engineer’s estimate for change order and maintain comprehensive records.
Ensure contractor work for compliance with plans, specifications and schedules, monitoring and coordination of material samples for testing. Coordinating construction survey and electrical inspection, conduct and or witness all testing upon contract materials, equipment installation etc.
Monitor and coordinate safety and quality control, ensuring project is constructed in accordance with applicable safety regulations.
Report any defective work to the contractor for correction, prepare and issue appropriate reports for compliance documentation.

project manager à james cubitt & partners
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis mai 2021

Dear HR Manager,
I thank you for providing me the opportunity to submit my candidature for
The Project Manager vacancy within your esteemed organization. I would like to
briefly introduce my experience here and further details in the attached resume.
I am a Civil Engineer with a proven track record of 25 years in construction with
major key players in the design, consultancy, & Contractors of International origin. I
have completed various mix-use High Rise, Hotels, residential buildings, villas,
commercial, and industrial projects. Salient projects highlighting my career are
(G+63, G+45, G+30) in Dubai for 5* hospitality and mix-use residentials. I have an
extensive 5 years of experience in handling design coordination and approvals with
client Interfaces for major clients and developers (e.g., Dubai properties, Nakheel,
DMCC, Seven Tides, Kempinski, Move n pick, Al Safeer etc...). Moreover, I am well
versed in the design coordination & approvals with Authorities (e.g., Dubai
Municipality, Trakhees etc..) under my current employer James Cubitt & Partners
and previous employers. Currently, I am working as a Project Manager - Design &
Supervision for Cluster Z in JLT (2B+G+5P+32) which is a high-end mix-use high rise
having 2, 701 apartments including 4*hotel rooms & retail.
Furthermore, I have an extensive 19 years of Construction Project Management and
am well versed with practical knowledge of FIDIC contracts namely FIDIC ’87 and
FIDIC ’99 first edition of Red Book.
The achievements, I managed in my career are the projects which included Design
Coordination, Authority Approvals, Budgeting, Program execution, Client Interaction
& coordination with the technical team, contract negotiations, and implementation
until complete execution and handing over of the successfully executed projects.
Essentially based on Engineering and Construction laws, I managed to achieve higher
gains in the positions of my company.
I thank you again for your consideration and look forward to a positive response for
a face-to-face interview to further discuss the role and responsibilities in detail.
Yours sincerely,
Mohammed Hassan Fehmi
UAE (0) 54 499 7747

Snr. Resident Engineer / Project Manager à NEB
  • Émirats Arabes Unis - Dubaï
  • septembre 2014 à mai 2022

project management Move n pick 5* hotel apartments, kimpenski hotel palm jumeira,

Project Manager à National Engineering Bureau
  • Émirats Arabes Unis - Dubaï
  • septembre 2014 à mai 2017

for Safeer Tower 1 & 2, 2B+G+1P+14 High Rise Building,
Business Bay Area Dubai, UAE
** Involved in evaluating project performance, managing budgets/ financials, maintaining project delivery schedules
and other SLA parameters to enhance project profitability
** Coordinate with team members in maintaining construction schedule, budget and contingency across assigned
projects involving earth works, culverts, infra structure, high rise, building works, power plant projects, piling
works, coffer dam, dewatering system and textile mills
** Interact with design consultants for delivering construction documents; guide team members in processing tenders.
Follow up with contractors and suppliers in effectively maintaining procurement schedules/ other quality parameters
** Evaluate data collated from project teams for producing appropriate project summary reports

Project Manager
  • juin 2013 à novembre 2013

** Spearheaded team efforts across project assignments like Composite Decking System
Bahria Icon Tower, Composite Decking Systems for a 60 storey building in Karachi
($2, 500, 000)
** Guided team members in managing construction schedule/ operation, preparing project
budgets/ costs and contingency plans
** Coordinated activities related to procurement, hauling and erection of building storey
floors with steel framed decking system
** Collaborated with various design consultants in effective delivery of construction
documents, administering construction tender processes
** Followed up with contractors and suppliers in maintaining material delivery schedules/
other quality parameters
** Interacted with team members in managing project contracts and implementing project
standards across the assigned project
** Updated project status to the senior management using detailed reports and
presentations to enable effective decision making

Project Manager
  • juin 2013 à novembre 2013

* Guided team members in preparing project documentation, maintaining project standards and submitting project
status reports to the senior management to enable effective decision making
Major Earth Works, Culverts, Building Works, Piling Works Projects:
** Pakistan Petroleum Limited Exploratory Wells ($1, 500, 000)
** Badin (Area Development including earth works, temporary road works and concreting)
** Gambat South IV (Area Development including earth works and concreting)
** Thar Airport - Civil Aviation Authority ($8, 000, 000)
** Terminal Building ($2, 500, 000)
** Runway, Asphalt concreting Length 2, 684 m ($3, 500, 000)
** Earth works, removing of overburden ($1, 600, 000)
** Right Bank Outfall Drain - Reach 1, 2 & 3 project ($1, 220, 000)
CELLPOR Building Solution

Project Manager à Reliance Consultancy and Engineering Works
  • novembre 2013 à août 2013

Spearheaded day to day operations of the construction division for smooth implementation of assigned projects in
compliance to project delivery schedules and other SLA parameters

Project Manager à Harbin
  • Chine
  • juin 2011 à mai 2013

** Coordinated day to day activities at the combined Cycle Power Plant 747 MW project
worth $5, 500, 000 at Guddu Thermal Power Stations and Bahria Icon Tower Karachi
project worth $6, 600, 000
** Prepared/ implemented plans for placing composite decking system of Jumping Tower
cranes, concrete pumps, composite structure of concrete and decking system
** Set up piling, earth work, building works, dewatering system (well point system) in
coordination with construction coordinators
** Collaborated with the planning manager in preparing initial scope review and aligning
initial project budget with project execution program
** Designed Coffer Dam, Dewatering System (Well Point system) for preventing canal
water from entering into the construction area and excavation up to 13 m
** Implemented de-watering system, CW Pump House, Cooling Tower, Intake & Open
Channel, Discharge Channel
** Followed up with team members pertaining to project closeout, final reporting,
administration of warranties, ensuring compliance to document retention requirements
** Evaluated project designs to align with relevant design standards and codes. Interacted
with civil & structural team in evaluating projects’ performance
** Prepared design calculations, reports & drawings based on project requirements
Project:
Power Generation
Plant Based on Natural

Project Manager
  • janvier 2009 à mars 2011

** Coordinated activities related to Combined Cycle Power Plant 560 MW project worth
$1, 450, 000
** Managed project for Karachi Electric Supply Corporation encompassing
implementation of Coffer Dam, Well Point Dewatering System, Piling, Admin Building
Structure (including finishing), Foundations, Intake Channel and Pump House (500m
long intake channel)
** Designed/ implemented de watering system for excavation up to 11.5 m in depth
** Evaluated/ ensured compliance to drawings, technical specifications and bills of
quantities across the construction process
** Interacted with clients for collating/ evaluating requirements for aligning with project
deliverables. Enhanced client satisfaction by effectively resolving issues and providing
qualitative service delivery
Project:
Refurbishment Power
Plant Construction

Project Manager à Harbin Electric Inc
  • Chine
  • janvier 2009 à mai 2009
Construction Manager
  • janvier 2007 à décembre 2008
Construction Manager à Building Construction
  • janvier 2007 à décembre 2008

** Catered to client Karachi Electric Supply Corporation in managing plant 1 Foundation
Pads, Piling, Warehouses, Canal dredging (cleaning) worth $300, 000
** Interacted with clients for collating/ evaluating requirements for aligning with project
deliverables. Enhanced client satisfaction by effectively resolving issues and providing
qualitative service delivery
** Participated in project design and construction meetings based on project and
operational requirements
Other

à Power Generation Plant based on Natural Gas at Dewan Mushtaq Mills
  • Émirats Arabes Unis
  • novembre 2002 à mars 2003

** Power Generation Plant based on natural gas at Dewan Textile unit 2 ($375, 000

à Dewan
  • février 2000 à avril 2001

** Power Generation Plant based on Natural Gas at

à Dewan
  • avril 1999 à janvier 2000

** Power Generation Plant at

Civil Engineer à TIY contractors and real estate
  • Turquie - Mersin
  • janvier 1998 à janvier 2000

supervising and executing construction of villas
240 sqyds
500 sqyds

à Dewan Mushtaq Group (Dewan Sugar, Dewan Textiles)
  • février 1998 à mars 1999

** Dewan Power (4 nos. 15 MW power plants

Éducation

Baccalauréat, Civil Engineering
  • à Eastern Mediterranean University of Engineering andTechnology
  • janvier 1997

I have done my civil engineering from Turkey in 97. my majors were civil engineering, project management.

Specialties & Skills

Project Management
Civil Engineering
Team Management
Management
MS Project
BUDGETING
CONTRACT MANAGEMENT
CUSTOMER RELATIONS
DELIVERY
ENGINEERING
MANAGEMENT
MEETING FACILITATION
NATURAL GAS
PROJECT DESIGN

Langues

Anglais
Expert
Turc
Expert
Urdu
Expert

Formation et Diplômes

Project Management Professional (in Progress) (Formation)
Institut de formation:
PMI USA
Date de la formation:
July 2016
Durée:
35 heures

Loisirs

  • Games, Physical Activities
    I am a member of Inter-nations. Being part of bowling team I have won the bowling tournament 4 times. I take active part in games like volleyball, tennis, bowling, badminton.