13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.
Period: June 2005 - December 2008.Retrenched due to operational requirements.
Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.
• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151
Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg
Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)
Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.
Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)
Period: June 2005 - December 2008.Retrenched due to operational requirements.
Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.
• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg
Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)
Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.
Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)
Period: June 2005 - December 2008.Retrenched due to operational requirements.
Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.
• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg
Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)
Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.
Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)
Period: June 2005 - December 2008.Retrenched due to operational requirements.
Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.
• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg
Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)
Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.
Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)
Period: June 2005 - December 2008.Retrenched due to operational requirements.
Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.
• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg
Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)
Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.
Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)
Period: June 2005 - December 2008.Retrenched due to operational requirements.
Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.
• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg
Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)
Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.
Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)
Period: June 2005 - December 2008.Retrenched due to operational requirements.
Responsibility.
• Site Manager Oaks Mine
1. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
2. Attend production meetings with De Beers management for planning purposes.
3. The hiring and control of labour work force.
4. Cost control of the mining operation and documentation.
5. Ordering and control of material and equipment.
6. The planning and running of the in pit mining operation which includes all Health and Safety issues.
7. Monitor blast patterns and drill depths.
• Responsible for all Survey: 6. Design and set out all drill patterns according to the mines requirements including survey notes
7. The survey of production advances for calculation and verification of payment certificate.
8. Responsible for grade control at loading and dumping areas.
9. Monitoring of high wall movement and stability.
10. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
11. Survey of loading face positions on production ore blast for model depletion.
12. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
13. Survey of loading face positions on production ore blast for model depletion.
14. Planning and designing blast patterns drilling purposes.
15. Setting out of drill holes, recording levels and survey notes for the blaster.
16. The surveying of Kimberlite positions per level for accurate representation on plans.
17. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
Position: Branch Manager
Sterns Jewellers.
Roodepoort.
Period: 1983-1985
Responsibility: 1. Sales and reaching of sales targets.
2. Hire, control and training of staff.
3. Organizing sales promotions.
4. Client liaison.
Position: Underground Surveyor
Western Areas Gold Mine
Ranfontein \ Westonaria
Period: 1980-1983
Responsibility: 5. Setting out of direction lines and grades for mining purposes.
6. Measurement of face positions for month end payments.
7. Plotting of direction lines and face positions surveyed underground on surface plans.
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Position: Senior Surveyor
Aveng Moolmans
Siguiri Gold Mine
Guinea
Period: March 2012 - March 2014 (Retrenched due to end of contract)
Responsibility.
• Responsible for all Survey: 1. The survey of production advances for calculation and verification of payment certificate.
2. Responsible for grade control at loading and dumping areas.
3. Monitoring of high wall movement and stability.
4. Survey of loading face positions on production ore blast for model depletion.
5. Building Haulages for payment certificate.
Position: Operations Manager
PlatiStone
Sandsloot Farm
Anglo Platinum
Mogalakwena
Mokopane
Period: May 2010 - 22 February 2012 (Retrenched due to operational requirements)
Responsibility.
1. Manage of operations to reach assigned targets.
2. Control work force, plant and machines.
3. The hiring and control of labour work force.
4. Ordering and control of materials.
5. Quality control of materials for sales and marketing.
6. Attending board of Directors and production meetings.
Position: Sectional Surveyor
MCC Group
Everest Platinum
Lydenburg
Period: May 2009 - July 2010 (Resigned to start new position as Operations Manager at PlatiStone)
Responsibility.
Check and control of surveyors, measurement of month end figures, planning
And setting out face positions and all general survey requirements.
Position: Site Manager / Quality control (Survey)
Mafofela Mining
Backed by,
Hanwill
Oaks Mine (Swartwater) and Venetia Mine (Musina)
Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151
Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.
Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002
Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151
Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.
Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002
Position: Site Manager
Henzen Civils
Benoni
Period: 1997 -1998
Contact Person: Petrus Oosthuizen.
Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site
1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.
Position: Site Manager
Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151
Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.
Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002
Position: Site Manager
Henzen Civils
Benoni
Period: 1997 -1998
Contact Person: Petrus Oosthuizen.
Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site
1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.
Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635
Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.
Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151
Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.
Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002
Position: Site Manager
Henzen Civils
Benoni
Period: 1997 -1998
Contact Person: Petrus Oosthuizen.
Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site
1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.
Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635
Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.
Position: Surveyor
Roads and Earthworks
FDF Civil Contractors
Period: 1988 -1989
Retrenched
Responsibilities on all company sites: 1. Setting out of roads and services with levels.
2. Taking quantities and measurements for payment for certificate.
3. Health and safety on site.
4. Drawing up certificates and having them singed for payment.
Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151
Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.
Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002
Position: Site Manager
Henzen Civils
Benoni
Period: 1997 -1998
Contact Person: Petrus Oosthuizen.
Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site
1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.
Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635
Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.
Position: Surveyor
Roads and Earthworks
FDF Civil Contractors
Period: 1988 -1989
Retrenched
Responsibilities on all company sites: 1. Setting out of roads and services with levels.
2. Taking quantities and measurements for payment for certificate.
3. Health and safety on site.
4. Drawing up certificates and having them singed for payment.
Position: Underground Surveyor
Cons Modderfontein Gold mine
Brakpan
Period: 1986-1988
Responsibility: 1. Setting out of direction lines and grades for mining purposes.
2. Measurement of face positions for month end payments.
3. Plotting of direction lines and face positions surveyed underground on surface plans.
4. Measure and plot of development face positions.
Position: Surveyor Open Cast Mine and Site Manager
For HUF Mining and construction
De Beers Consolidated Mines, The Oaks Mine
Period: November 2002 - May 2005.
Contact Person: Fred Beytell
083 231 3151
Responsibility: 1. Design and set out all drill patterns according to the mines requirements including survey notes
2. The survey of production advances for calculation and verification of payment certificate.
3. Responsible for grade control at loading and dumping areas.
4. Monitoring of high wall movement and stability.
5. Reconciliation of face positions for quarterly and annually to measure actual vs. planned production.
6. Survey of loading face positions on production ore blast for model depletion.
7. Planning and designing blast patterns drilling purposes.
8. Setting out of drill holes, recording levels and survey notes for the blaster.
9. The surveying of Kimberlite positions per level for accurate representation on plans.
10. Survey of direction lines of waste rock dumps and tailing dumps in advance of extensions.
11. Survey direction lines of waste rock dumps and tailings dumps in advance of extensions.
12. Member of special areas committee.
13. Site Manager from the 15 March 2005
• Site Manager
14. Manage the load and haul of blasted material from open pit to ore/waste stock piles.
15. Attend production meetings with De Beers management for planning purposes.
16. The hiring and control of labour work force.
17. Cost control of the mining operation and documentation.
18. Ordering and control of material and equipment.
19. The planning and running of the in pit mining operation which includes all Health and Safety issues.
20. Monitor blast patterns and drill depths.
Position: Self Employed in Botswana in the line of Paving, Small earth works, Concrete works and general construction, left due to economical situation at the time, was not economically viable.
I was self employed from 1998 - November 2002
Position: Site Manager
Henzen Civils
Benoni
Period: 1997 -1998
Contact Person: Petrus Oosthuizen.
Responsibity: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending Site meetings and production meetings.
7. Planning, coordinating and conducting civil works on site.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Control and enforcing Health and Safety on site.
10. Short term and long term planning of works required on site
1. Worked one year in South Africa and one year in Botswana while I was employed at Henzen Civils.
Position: Site Manager
Rob Stephens cc.
Civil and Construction
Springs
East Rand
Period: 1989-1997
Contact Person: Rob Stephens
(011) 818 1635
Responsibities: 1. Site establishment and setting out of works.
2. Ordering and control of all equipment and materials.
3. In charge of running the site of civil road works, earth works and services.
4. Hiring and control of the labour work force.
5. General costing and wages of labour on site.
6. Attending site inspections when necessary.
7. Planning, coordinating and conducting civil works on site which includes road, earth works and services.
8. Running and control of all heavy machinery required for the works including the hiring of equipment when required.
9. Attending Site meetings and production meetings.
Position: Surveyor
Roads and Earthworks
FDF Civil Contractors
Period: 1988 -1989
Retrenched
Responsibilities on all company sites: 1. Setting out of roads and services with levels.
2. Taking quantities and measurements for payment for certificate.
3. Health and safety on site.
4. Drawing up certificates and having them singed for payment.
Position: Underground Surveyor
Cons Modderfontein Gold mine
Brakpan
Period: 1986-1988
Responsibility: 1. Setting out of direction lines and grades for mining purposes.
2. Measurement of face positions for month end payments.
3. Plotting of direction lines and face positions surveyed underground on surface plans.
4. Measure and plot of development face positions.
Position: Manager
Ster Kinekor
Eastrand Region
Period: 1985-1986
Responsibility: 1. Sales and reaching of sales targets.
2. Hire, control and training of staff.
3. Organizing sales promotions.
4. Client liaison.
Elementary Mine Survey. Chamber of Mines. Courses and Training done on Western Areas Gold Mine • Elementary Legal Knowledge. (Certificate) • Elementary Mine Geology. (Certificate) • Elementary Mine Survey. (Certificate) Completed Matric (Grade 12) in 1977