Deputy Director
Al-Mousa Car Spare Parts and Gas Cylinder Shops.
Total years of experience :33 years, 2 Months
- Management an enterprise's activity and staff in order to attain company goals.
- Implementing budget SR 50 Million and company procedures, maintaining inventories, ensuring a constant flow of resources, and evaluating business performance.
- Aided business development efforts, developed processes, and played a key role in driving revenue growth SR 5 Million.
- Reviewed and analyzed reports on periodic expenditures.
1- BI-10-1423 - Replace Ras Tanura Terminal South Control System, Saudi Aramco.
2- BI-10-00953 - Replace Process Analyzers, Saudi Aramco - RasTanura Refinery.
3- BI-10-00609 - Replacing Old Foxboro System by New Yokogawa Control System in Area 48 and Replaced Old Foxboro System by Honeywell System with Associated Subsystem in Area 232, Saudi Aramco - RasTanura Refinery.
4- BI-0068 - Installation Online Viscometer Analyzer for Paving, Plant-15, Saudi Aramco - RasTanura
Refinery.
1- Petrochemical Advance Polypropylene Company (APPC), AL- Jubail
2- BI-10-0065 - Diesel Hydrotreating, Saudi Aramco - RasTanura Refinery.
3- Design Engineering Office (IK-EPC) - Al Khober.
1- BI-10-03194 - Replace the old system (Foxboro) to new system Honeywell for Natural Gas Liquid
(NGL), Saudi Aramco - RasTanura Refinery.
2- BI-0068 - Additional Asphalt Handling Facility, Saudi Aramco - Ras Tanura Refinery
BI-10-03503 - Khuff Condensate Upgrading, Saudi Aramco, Ras Tanura Refinery.
- Diagnosing & troubleshooting wire, PC-strand and Galvanization machines breakdown hardware & software.
- Calibration Air/Gas ratio for Burners
- Maintain the sensor like (Thermocouple type K or resistance thermometer), controller setting parameter, Level Control, pH Control and Control Valve (Pneumatic & Electrical type)
- Verify the calibration for Weighting Scale (Calibration platform scale, digital type, brand schember and soehnle)
- Maintained computer controlled processes such as communications, network cards, wiring, software and hardware system of PLC (Siemens) PG 710, and made changes in the programming according to the operation requirement.
- Prepared and implemented preventive and condition based maintenance, and repaired major instrumentation and electrical problems and diagnose.
- Maintained appropriate inventory of parts for equipment preventing extended down time for rides and facilities.
- In electrical field maintain the Frequency converter unit for AC motor like, Current source intermediate circuit and Voltage source intermediate circuit.
- Create preventive maintenance periodical schedule for High voltage 34.5KV, Medium voltage 13.8KV, Utility Plant and Fire Fighting.
Automation