Work Experience

Total years of experience :18 years, 4 Months

Projects Manager - Turnkey interior fit out jobs. at Hitches and glitches under Farnek Group of companies.
  • United Arab Emirates - Dubai
  • My current job since June 2016

• Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & standards.
• Make sure the toolbox meeting daily with workers and foremen before starting the works.
• Taking the material approvals from the Consultant and client.
• Make and arrange the required manpower details and manpower arrangement according to the site requirement.
• Arrange the meeting with foreman and supervisors by once in a week for preparing the work status report and site issues.
• Estimated material requirements and costs, and presented design to client for approval.
• Finishing the projects with time bond.
• Conferred with client to determine factors affecting interior environments, such as budget, and architectural preferences, etc.
• Advised client on interior design factors such as space planning, layout and utilization of furnishings or equipment, and color coordination.
• Subcontracted fabrication, installation, and arrangement of carpeting, accessories, paint and wall coverings, art work, furniture, and related items.
• Making the as built drawing with the coordination of Draughts man.
• Preparation of interim and final payment certificate for sub-contractors
• Customer Co-ordination - Site meet / visit to access customer requirements at enquiry state and correspondence during execution of the projects.

Assistant project manager at Sobha interiors (sobha group of companies )
  • United Arab Emirates - Dubai
  • June 2015 to April 2016

Responsibilities:
 Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & kick of meeting.

 Procurement the materials for start the project and shop drawing submission to client/consultant.

 Taking site measurements and suitable quotation from sub contactor if required.
 Make sure the toolbox meeting weekly with workers and foremen before starting the works.
 Arrange the meeting with client or consultant as weekly bases.
 Preparation of Minutes of Meeting.
 Co ordination with Factory manger for the production and delivery of material on time.
 Taking the material approvals from the Consultant or client
 Make and arrange the required manpower details and manpower arrangement according to the site requirement.
 Arrange the meeting with foreman by once in a week for preparing the work status report and site issues.
 Estimated material requirements and costs, and presented design to client for approval.
 Assisting the post contract team for additional Variations.
 Forwarding Quality inspection Request to quality Department.
 Finishing the projects within the time bond.
 Confirmed with client to determine factors affecting interior and total project issues.
 Environments, such as budget, and architectural preferences,
 Accessories, paint and wall coverings, art work, furniture, and related items.
 Making the as built drawing with the help and coordination of Draughts man.
 Taking snag list with site engineers when end of the project and solutions.
 collecting project completion certificate from client or

Assistant project manager at Al reyami interiors (Al reyami group )
  • United Arab Emirates - Dubai
  • June 2006 to August 2014

Responsibilities:
 Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & kick of meeting.

 Procurement the materials for start the project and shop drawing submission to client/consultant.

 Taking site measurements and suitable quotation from sub contactor if required.
 Make sure the toolbox meeting weekly with workers and foremen before starting the works.
 Arrange the meeting with client or consultant as weekly bases.
 Preparation of Minutes of Meeting.
 Co ordination with Factory manger for the production and delivery of material on time.
 Taking the material approvals from the Consultant or client
 Make and arrange the required manpower details and manpower arrangement according to the site requirement.
 Arrange the meeting with foreman by once in a week for preparing the work status report and site issues.
 Estimated material requirements and costs, and presented design to client for approval.
 Assisting the post contract team for additional Variations.
 Forwarding Quality inspection Request to quality Department.
 Finishing the projects within the time bond.
 Confirmed with client to determine factors affecting interior and total project issues.
 Environments, such as budget, and architectural preferences,
 Accessories, paint and wall coverings, art work, furniture, and related items.
 Making the as built drawing with the help and coordination of Draughts man.
 Taking snag list with site engineers when end of the project and solutions.
 collecting project completion certificate from client or

Project Engineer at ANC interiors (ANC holdings)
  • United Arab Emirates - Dubai
  • April 2004 to June 2005

Responsibilities:
 Execution of Project - Preparation of project execution plan and ensuring execution of all works in accordance with the approved design / drawing, engineering specification, applicable code & kick of meeting.

 Procurement the materials for start the project and shop drawing submission to client/consultant.

 Taking site measurements and suitable quotation from sub contactor if required.
 Make sure the toolbox meeting weekly with workers and foremen before starting the works.
 Arrange the meeting with client or consultant as weekly bases.
 Preparation of Minutes of Meeting.
 Co ordination with Factory manger for the production and delivery of material on time.
 Taking the material approvals from the Consultant or client
 Make and arrange the required manpower details and manpower arrangement according to the site requirement.
 Arrange the meeting with foreman by once in a week for preparing the work status report and site issues.
 Estimated material requirements and costs, and presented design to client for approval.
 Assisting the post contract team for additional Variations.
 Forwarding Quality inspection Request to quality Department.
 Finishing the projects within the time bond.
 Confirmed with client to determine factors affecting interior and total project issues.
 Environments, such as budget, and architectural preferences,
 Accessories, paint and wall coverings, art work, furniture, and related items.
 Making the as built drawing with the help and coordination of Draughts man.
 Taking snag list with site engineers when end of the project and solutions.
 collecting project completion certificate from client or

Education

Diploma, CIVIL
  • at Technical Board Of Education
  • April 1998

Specialties & Skills

Interior Design
Installation
Preparation
Project Execution
Approvals
MS word

Hobbies

  • Listening to music, sports,reading books