Rajkumara Patil, Supervisor

Rajkumara Patil

Supervisor

Larsen & Toubro - United Arab Emirates

Lieu
Inde - Pune
Éducation
Etudes secondaires ou équivalent, HSC
Expérience
19 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :19 years, 1 Mois

Supervisor à Larsen & Toubro - United Arab Emirates
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis août 2017

Expo 2020 R1048 Package 1 and 5 (RTA Project) Jebel Ali, Dubai, United Arab Emirates.

As a In Charge of Bridge of Piling work and Post Tensioning Work.
Involvement in activities of POST TENSION such as Profiling, Threading, Stressing and Grouting of 35 Bridges having length from 80 Metres to 200 Metres of Continue Span of 2 Interchanges done in Quality and Safety keeping in mind.
Carefully Handling of all Post Tension Material with minor wasteges of viz. Ducts, Anchor Cone, Coils, Wedge Plate, Spacer and wedges etc. Complete from store to particular site.
Having Close Coordination with workers, seniors, Consultant and Client without any complaint with very much sophisticated manner.
Responsible for drawing up detailed project plan covering overall project theme, requirements of manpower, machines, material resources and activity schedules within stipulated time of completion
Analyzing the proposing site location as well as the job completion. Strategically planned and assessed the basic requirements while setting up the technical infrastructure of the project and reviewed all the project proposals
Strategically executing the plans and procedures while ensuring the project quality control on material and other processing's & optimum utilization of manpower
Overall understanding of Contract agreement and accordingly manage quality and quantity of work, and ensuring accurate rendition of drawn work in practical
Entrusted with the task of managing resources (Manpower, materials & machinery) judiciously while administering the site, labor, taking measurements, reconciling material etc. For construction
Managing and leading a team of Estimators, Junior Engineers, Site Personnel, Surveyors and Draftsmen to commission the projects as scheduled
Follow the project from start to finish and make any necessary changes along the way, ensuring that the procedure is being followed while checking the safety features of the project during the time it is being completed.
Coordinating with Independent test laboratory.
Maintaining and monitoring construction progress.

Managing resources & allocating duties to Foreman and Lead-man for daily activities.
Conduct each activity Inspection with the Civil Inspector, consultant or client.

Preparing Request for Inspections submittals for each activity approval of consultant or Client.
Handle both site & office work.
Proper management of materials and workmanship.
Coordination with sub-contractors for the smooth flow of work.

Supervisor à Larsen & Toubro - Qatar
  • Qatar - Doha
  • septembre 2015 à juillet 2017

Al Wakrah Bypass Road Project Al Wakrah, Doha, State of Qatar.
As a In Charge of Bridge of Piling work and Post Tensioning Work.
Involvement in activities of POST TENSION such as Profiling, Threading, Stressing and Grouting of 29 Bridges having length from 30 Metres to 220 Metres of Continue Span of 5 Interchanges done in Quality and Safety keeping in mind.
Carefully Handling of all Post Tension Material with minor wasteges of viz. Ducts, Anchor Cone, Coils, Wedge Plate, Spacer and wedges etc. Complete from store to particular site.
Having Close Coordination with workers, seniors, Consultant and Client without any complaint with very much sophisticated manner.
Total Post Tension Material Quantity 3000 MT.

Civil Foreman, PTW Holder à Arabian Industries Projects LLC
  • Oman - Muscat
  • juin 2011 à juin 2014

Supervising Excavation work during Pipe Support Foundation
OIL & GAS Pipeline Foundation.
Reinforcement Footing & Column Work as per drawing.
Foam Work & Concreting.
Independently handling Khamila Plant Station Pipe Line Construction Work.
Conducting the Tool Box meeting.
Labour management at the site.
Reporting to Project Engineer.

Sr. Supervisor à Sonali Enterprises
  • Inde - Pune
  • avril 2010 à mai 2011

Supervising company electrical maintenance
Underground electric cable(Pipe) laying.
Cable (wire/service wire) installation.
Handling electrical site Work.

Officer Pressing à Afcons Constructions Middleast LLc.
  • Émirats Arabes Unis - Dubaï
  • janvier 2009 à janvier 2010

Supervising Excavation work during Pile cap Foundation.
Reinforcement Pile cap & Column, Foam Work as per drawing.
Reinforcement Pier. Box Girder Span, Foam Work & Concreting.
Independently handling Post Tensioning Work.
Conducting various test per material using in PT, work by client requirement.
Conducting the Tool Box meeting.
Labour management at the site.
Reporting to BRIDGE MANAGER

Senior Foreman à VSL India private Limited
  • Inde - Delhi
  • août 2006 à décembre 2008

Project DMRC (Delhi Metro Rail Corp.) BC-4 & BC-8 Precast yard and Erection work.
Client IJM-IJMII Infrastructure India Limited.
Duration Aug’06-Oct’08.
Role Senior Foreman.

Responsibilities:
Supervising Execution work during erection & Post-Tensioning operation.
Profiling of Segment as per drawing.
Stressing of Segment Span as per required load.
Conducting various test per material using in PT

PROJECT HANDLED PT SLAB.

Omaxe House to Home Shopping Mall, Sec-48.
Ansal Florence Club, Sec-56.
ILD Trade Centre, Tikri, Sec-47.
Medicity, Sec-39, Gurgaon.

Role Site in Charge.

Responsibilities:
All the Post-Tensioning (Profiling, Cable Threading, Stressing & Grouting) Works at the appropriate site.
Preparation of all site reports.
Conducting Tool Box Talk Meeting.
Man power planning and Labour management at the site.
Co-ordinate to the Client.

Supervisor à BBR India Limited
  • Inde - Kolkata
  • octobre 2004 à juillet 2006

Project Anand Rao Circle Flyover Bridge, Bangalore.
Second Vivekananda Bridge Project, Dakshineshwar, Kolkata.
ROB Bali Halt, SVBTC Project.
Guindy Cir4cle Flyover Bridge Kathipara, Chennai.
Duration Oct’04-Jul’06.
Role Supervisor.

Responsibilities:
Supervising execution work during profile of segment & Erection PT Stressing operation as per Drawing. Stressing & Grouting of post tensioned span.
Co-ordinate to Client.

Technician à Dynamic prestress projects and services
  • Inde - Nashik
  • décembre 2003 à septembre 2004

Project Gowthami Godavari River Bridge.
Vashishta Godavari River Bridge, Ravulupalem, Rajahmundry.
ROB Badampudi & Ellura Canal Bridge, Tadepalligudam.
ROB Malakapur, Nagpur.
Hagari River Railway Bridge Hagari, Bellary.
Sangola River Railway Bridge, Sangola.

Éducation

Etudes secondaires ou équivalent, HSC
  • à Maharashtra State Board Education
  • mars 2000

Specialties & Skills

Oil and Gas
Tunnels
Bridge Construction
MS Office

Langues

Anglais
Moyen
Hindi
Expert
Marathi
Expert
Kannada
Expert
Tamil
Débutant
Arabe
Débutant
Malayala
Débutant