Rami Elktatny, Mechanical construction Manager

Rami Elktatny

Mechanical construction Manager

PGESCo

Location
Egypt
Education
Master's degree, Project management
Experience
26 years, 0 Months

Share My Profile

Block User


Work Experience

Total years of experience :26 years, 0 Months

Mechanical construction Manager at PGESCo
  • Egypt - Cairo
  • My current job since June 2015

• Perform review of all Contract documents for construction.
• Assist SM/CM in the preparation of the Project Division of Responsibility
• Coordinate execution of the project construction
• Monitor construction for the use of appropriate equipment, methods, and resources and review construction progress against the execution plan/schedule to ensure progress as scheduled. When evaluation identifies problems, work with the Contractors to identify the solutions and corrective actions
• Ensure enforcement of Contractor(s) safety programs
• Review Field Engineering Daily Reports
• Coordinate punch list activities for the issuance or Construction Completion and Taking Over and Acceptance Certificates.
• Support Site Contracts Administrator in the negotiation of contractor change proposals.
• Review quantities of work for monthly progress estimate for payment to Contractors
• Verify Contractor(s) progress prior to issuance of Construction Completion Certificates
• Ensure the effective implementation of the Contractor(s) quality system at the Site
• Conduct coordination meetings between contractor(s) as required
• Be a role model for PGESCo’s “Zero Incident” safety philosophy for all project employees.
• Coordinates and monitor the implementation of the construction schedules, manning charts, and material and equipment requirements.
• Responsible for overall supervision of PGESCo’s personnel, in assigned area of responsibility.
• Ensures performance evaluations are conducted on assigned personnel and counseling programs are maintained.
• Ensures subordinate personnel receive progressive training to enable them to assume additional responsibilities.
• Plans and implements procedures to ensure construction operations are continuously adhering to engineering designs, specifications, quality standards, schedules and budget.
• Responsible for coordination of construction operations to ensure they coincide with the overall established schedules.
• Maintain relationships with the client and their representatives, as assigned.
• Ensure that PGESCo and local/national regulatory safety codes, requirements and standards are being complied with in assigned area of responsibility. Ensures the Zero Accident Philosophy is incorporated into all aspects of construction operations. Actively participates in scheduled safety meetings.
• Perform general administrative functions inherent in jobsite supervisory positions.
• Ensures corporate policies and procedures are fully implemented. Establishes field procedures and objectives within the corporate policies and procedures, as necessitated by conditions at a jobsite.
• Review contractors’ invoices; technically and actual quantities take off.
• Generate the required calculations, technical, and specifications documents for the new projects.

Senior mechanical Engineer at Power Generation Engineering And service Company, PGESCO
  • Egypt - Cairo
  • November 2008 to June 2015

• Responsible for daily monitoring of contractor’s on-site activities to ensure the work is performed in accordance with contract requirements.
• Develop scope definition and technical data for field issued contract change notice.
• Perform construction review.
• Prepare daily reports.
• Develop punch list of incomplete work.
• Implement QC/QA and safety management program.
• Provide technical guidance to contractors.
• Participate in weekly safety walks
• Review and develop ITP for all mechanical construction activities

Technical Service Manager at Inter-tech, (A Sole Agent of BELZONA)
  • Egypt
  • June 2005 to November 2008

Control Projects individually.
o Lead the technical department to achieve the customer satisfaction, high quality, fast, low cost and safe.
o Inspection the problem and determine the suitable solution.
o Plan the application from the beginning to the end of the job.
o Training the new members of BELZONA team.
o Reporting and document all the steps.
o Qualified the technicians every certain period.

Piping Site Engineer at HAS Hassan Allam Sons
  • Egypt
  • June 2004 to July 2005

o Site Commissioning and Handing Over.
o Working according to ASTM, ASME and ANSE codes
o Planning, performance charts, recourse allocation, monthly updating of schedules and reports.
o Follow-up the project and the progress, then gives support to the project.
o Design requirement in order to estimate the Installation hours and prepare the request of sub-offers to supplier and sub-contractors.
o Review of mechanical and construction drawings.

‎Main Projects
o North Cairo Power Station Project, Erection of pipes networks 16 KM (Carbon Steel, Ductile Iron, Cast Iron, Copper, Galvanized Steel, PE), Steel Structure, and Pumps.
o Noubaria Power Station Project, Erection of pipes networks 23 KM (Carbon Steel, Ductile Iron, Cast Iron, Copper, Galvanized Steel, PE), Sluice Gates and Stop logs.

Mechanical Erection Engineer at MHDA General & Industrial Contracting
  • Egypt
  • May 2000 to June 2004

o Site Commissioning and Handing Over.
o Planning, performance charts, recourse allocation, monthly updating of schedules and reports.
o Follow-up the projects and the progress, then gives support to the projects.
o Design requirement in order to estimate the erection hours and prepare the request of sub-offers to supplier and sub-contractors.
o Making and review invoices for owner and sub-contractors.
o Review of mechanical and construction drawings.
o Executive of mechanical projects.
o Management of sites.

‎Main Projects
In EGYPT
Sinai Cement Project, Erection of steel structures, pipes networks (Carbon Steel, UPVC, PE), and pumps.
Toshka 220/66 KV Sub Stations, Erection of steel structures, pipes networks (Carbon Steel), and pumps.
IN Algeria
400 KV Line, Installation tower’s electricity, erection and stringing.
 Hasi Massoud-Toggurt Line 170 Km.
 Toggurt-El Magayer Line 100 Km.
 Om El Tyoor-Biskra Line 80 Km.
IN Libya:
 Hyndai as Piping engineer
 El Khoms-Mhr 1 400 Kv 500 km (Coordinator).
 El Fargh petroleum planet (Fabrication, Erection platform), isolation pipes (hot, cold).
 Sirt line 220 Kv Deviation 8Km (Erection, stringing).

Production, maintenance, and Q.C. Engineer at EMECO Electro Mechanical Eng. Co.
  • Egypt - Cairo
  • May 1998 to May 2000

o In charge of production cable tray, cable ladder, steel tubes and steel structure
o With controlling the galvanization line & electro-plating line.
o Maintenance all the m/c of the factory included the CNC m/c.
o Participated to the marketing team.
o CNC programmer and operation for CNC muratec m/c, with campth 2000 program.

Education

Master's degree, Project management
  • at Victoria university
  • April 2015
Bachelor's degree, Good
  • at The Higher Technological Institute, H.T.I.
  • August 1996

Specialties & Skills

Languages

English
Intermediate
Arabic
Intermediate
French
Beginner

Memberships

PMI
  • Member
  • February 2009

Training and Certifications

PMP (Certificate)
Date Attended:
June 2009
Valid Until:
June 2024