SYNOPSIS
•Around 11 years of experience in Estimation, Execution, Testing & commissioning in MEP- Mechanical services.
•Also take involvement in design of interim systems.
•Proficient in managing Installation and maintenance operations.
•Familiar in system/ equipments as HVAC, Plumbing & sanitary, Fire fighting sprinkler and wet riser systems, Fire suppression systems, FCU, AHU, FAHU, Supply & Return Ducts, Fresh air, LPG, irrigation systems, Hot water generators, pumping systems, etc
•Quantity surveying, Quality control, Forecasting, Labour cost calculation.
•Always ready to work under pressure and to give the best output.
•Always take initiatives to improve the workmanship of labours and quality of works done.
CAREER SCAN

Project Engineer at BILT Middle East LLC
  • United Arab Emirates
  • December 2011 to March 2019
at EQUIPMENTS & SYSTEMS FAMILIAR WITH
  • November 2017 to March 2019

HOT & COLD WATER PIPING SYSTEMS.
•DRAINAGE U/G & H/L & STACKS
•SANITARY INSTALLATIONS.
•PUMPS (BOOSTER PUMPS, TRANSFER PUMPS, CIRCULATION & DOSING PUMP)
•VALVES & ACCESSORIES.
•FILTRATION (ACF, SAND FILTER, MULTIMEDIA FILTER) & SOFTENER
•HEAT EXCHANGER (PLATE, SHELL & TUBE)
•IRRIGATION SYSTEMS
•BMS INTERFACING WITH SYSTEM

HOT WATER GENERATION:
•HOT WATER BOILERS (WATER TUBE AND SMOKE TUBE TYPE)
•CALORIFIER, WATER HEATERS, HEAT PUMPS
•HYDRAULIC SEPARATOR
•CORROSION INHIBITOR
•EXHAUST/ CHIMNEY
•BMS & FIRE ALARM INTERFACING WITH SYSTEM

FIRE FIGHTING:
•FIRE PUMPS (DIESEL ENGINE, ELECTRICAL & JOCKEY)
•VALVES & HOSE REELS
•SPRINKLER AND WET RISER SYSTEM
•FIRE HYDRANT NETWORK
•BREECHING POINTS
•FIRE SUPPRESSION SYSTEMS (PRE-ACTION, DELUGE, FM200, ETC)
•FIRE ALARM SYSTEM (CAUSE AND EFFECTS)

HVAC:
•CHILLED WATER AND DUCTING NETWORK
•DAMPERS, PHE, VALVES,
•AIR HANDLING SYSTEMS (FAHU, AHU, FCU)
•BMS AND FIRE ALARM INTERFACING WITH SYSTEM

at Al Maktoum International Airpor
  • India
  • March 2015 to June 2016

Cost of Project 135 Million Dirhams (AED) for MEP
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
PreviousProject Sky Cargo Project

  • April 2014 to February 2015

Cost of Project 88 Million Dirhams (AED) for MEP
Role was responsible for overall Infrastructure (external) piping under the scope of Plumbing and Fire Fighting.
Installation of services/Pipeline (soil, waste, storm, water supply & Fire Fighting) from government provided stub outs/provisions to run entirely along the whole cargo compound in a ring for pressurized systems with various tap outs from the compound & connecting Drains to provided government Manholes as per rule and regulations of the authority.
Previous Project 38-Villa & Retail Development

at AL WASL
  • India
  • December 2012 to March 2014

Cost of Project 37 Million Dirhams (AED) for MEP
Role Looking over the Execution/Installation, T&C and Handing over of Plumbing (WS & DR) and Fire Fighting services overall under the scope of Mechanical works (Plumbing & Fire Fighting).
Previous Project HYATT RESIDENCY HOTEL & RESIDENTIAL APARTMENTS @ DUBAI HEALTHCARE CITY, DUBAI (

at JW MARQUIS MARIOTT HOTEL
  • India
  • December 2011 to July 2012

Cost of Project 300 Million Dirhams (AED) for MEP
Role Testing & commissioning of the Installed systems

at HOTEL RED FOX
  • India
  • December 2010 to August 2011

Cost of Project Rs. 1.5 Crore
Role looking over the Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units.

Mechanical Site Engineer at Sakar India Pvt Ltd
  • India
  • April 2009 to August 2011
at HOTEL LEELA PALACE
  • India
  • May 2009 to November 2010

Cost of Project Rs. 2.4 Crore
Role Looking over the Execution/Installation, T&C and Handing over of Hot water generator system overall.
Installation of the Hot Water Generators, Plate type Heat Exchangers, Centrifugal pumps, mixing tanks, water softening unit, all the piping for hot water distribution system and the flue (chimney) for the HWG units

Education

Bachelor's degree, MECH
  • at B.P.U.T (BIJU PATNAIK UNIVERSITY OF TECHNOLOGY)
  • January 2009

(

High school or equivalent, MECH
  • at E.B
  • January 2003

(

Bachelor's degree, MECH
  • at E.B
  • January 2003

(

High school or equivalent, MECH
  • at C.B.S.E
  • January 2001

(

Specialties & Skills

MS Office tools
Plumbing
Fire Protection
MECHANICAL
MICROSOFT WORKS
PLUMBING
MULTIMEDIA
NETWORKING
SHELL SCRIPTING

Languages

English
Expert
Hindi
Expert
Urdu
Expert