ASST GENERAL MANAGER
POWERMECH PROJECTS INDIA LTD
Total years of experience :30 years, 0 Months
Projects, 400KV to ELV system, Small Power, Firefighting, Lighting control, Fire Alarm, Emergency,
Earthing/Lightning protection, Nurse Call, BMS, Central Emergency battery, SCS, CCTV, ACS,
Master clock, SMATV, lighting control, medical gas Alarm, Fuel Facility system, Pneumatic gas
system, CCTV, LPG, Telecom and ELV systems.
AREAS OF EXPERTISE
Project Planning & Management
Project Engineering, Supervising project activities & handling complete cycle of project
management entailing requirement, estimation and final execution of project
Handling procurement of capital goods and consumables, Machinery/Equipment after
development of reliable and cost effective vendors
Ensure adherence to the rules and regulation as per the statutory bodies viz, DEWA, ADDC
Civil Defence & IEEE standards
Electrical Installation, testing and commissioning of installations
Installed, tested and successfully commissioned of electrification of various installations.
Working on initiates for energy conservation and implementation
Team Management
Directing and leading the technical personnel. Imparting continuous on job training to the
workforce for accomplishing greater efficiency.
Site Management & supervision
Working on talent pool and succession planning of the management cadre and workforce,
appraising their performance and providing feedback on the same
AECOM & Parsons
Projects- Infrastructure and MEP developments
2. Al-Barsha south Residential
complex(GF+2P+12Floors+Roof)--DubaiClient: Mohd
Alsayed Abdul NSHMI Development LLC
Job Responsibilities:
* Construction project management methodologies, overlooking, review and preparation
of MEP shop drawings & overall specifications, feasibility studies, project life cycle, cost
management and control techniques (value engineering), IT tools and systems
* Delivering and conceptualized MEP engineering solutions on assigned projects
comprising HVAC, Plumbing, Fire-fighting, Electrical, Specialized systems, etc., ensuring
profitable, on time and on quality completion of project successfully.
* Acquired full contract documentation from the tender division and initiated the
mobilization to the project, ensured all contract documents, latest revision drawings, ISO
manuals are made available at site at all times.
* Ensured timely preparation, review, submission and obtained approvals of all associated,
rendered schematic design from tender drawings for shop drawings and materials in
adherence to the project specification, requirements and compliance, MEP coordination
drawings, builders work drawings, detail drawings for material and equipment
installation, etc. Tendering, Estimation & Engineering
* Review & Understand all relevant Tender, Contract and Project documentation
* To provide engineering and technical assistance within the project/ operations
department and also to provide support to the tendering/ estimation department as
required.
* Oversee generating, follow up, reviewing and evaluate bids Supply and bids installation
technical offers.
* Initiated preparing of Engineering/ Material submittals, RFI’s/ ITP’s/ Method Statement
etc.
* Provided clear instructions and reviewing the work of design engineers and draft persons
in due time to deliver within the set timeframe and sound, while technical interface issues
are raised and dealt with and in aspect of value engineering.
* Ensured logs are maintained for drawings and materials, reviewed and submitted to
client/ consultant in time with optimization and full compliance with the contract specs
Projects Handled:
1. Marsa-Al-seef-Dubai; Client: Meraas Development
The project comprising food / beverage and retail made up of 8 buildings that will total a
built-up area of 8, 600m². Phase 2 has a local / cultural theme of food / beverage and
retail, comprising 20 buildings with a total built-up area of 19, 000m².
2. Gate Village-11-(5B+Serv+Conc+9Floors+Roof)-Commercial project-Dubai
DEWA 132KV/11KV substation-Business Bay & Doha ROAD S/S, Dubai
Al Maqtoum city, Nad al sheba up gradation-RTA street lighting
3. Dubai Airport R-1011 -Roads development-RTA-Dubai project
4. Dubai Airport upgradation-C4
5. Dubai Mall-Fashion Avenue Expansion
M/S.Arasmeta Captive Power Plant (p) ltd, India
Operation, Maintenance & Execution Manager
Project:-43MWx 2No’s-132KV O/D substation
Responsibilities:-
Overseeing the erection and commissioning of LT/HT equipment’s Spearheading and
arranging the electrical maintenance department
Handling the tasks of designing software and equipment to execute electrical engineering
tasks.
Responsible for preparing specifications for purchase of electrical equipment’s and
materials.
Developing relay and metering schemes, protective relays coordination study and setting
tables
Efficiently implemented the electric system models and calculations and defines ratings of
equipment/System(power demand, load flow, short ckt, transient stability, motor starting,
harmonics and ground)
Oversaw the functional philosophies for the electrical system control (load control,
synchronization, load Shedding, re-acceleration and restarting).
Played a pivotal role in ensuring that the design, equipment specifications and compliance
follows the Safety standards of the organization
Electrical engineer
in Electrical (
in Electrical (