Deputy Project Manager
Saudi Arabia Saipem
Total years of experience :17 years, 10 Months
Prioritizing the deliverables of AFC, method drawings, Procurement & Fabrication at Yard
Conducting weekly meeting and analyzing progress, productivity and forecast
Analysing monthly Progress, budget, schedule and mitigate if any issues
Monitoring the Risks in the Project & manage / mitigate them as per priority.
Allocating resources - manpower, materials, consumables & equipment in advance as per plan
Sequencing of NDT plan for smooth operations and to achieve the planned progress
Monitoring & controlling the scope is performed within the given budget and schedule
Managing the scope changes throughout the Project phase
Coordinating with internal departments for smooth workflow & shooting out the cause of flaws
Managing the Precommissioning activities coordinate with Commissioning team
Managing and Closing the B Punch Items raised by client prior to load out/Sail away
Managing the scope is performed within the given budget and schedule
Managing monthly invoice as per contract
Monitoring the Risks in the projects & manage / mitigate them as per priority.
Approving & Allocating resources - manpower, materials, consumables & equipment in advance as per plan
Conducting weekly & monthly project meeting with Client
Managing the scope changes throughout the project cycle
• Fixing Priorities to all cutting, prefab & fabrication activities in the Yard
• Leading Production Engineers (Structural, Piping, E&I and Mechanical) to feed the required information, procedures, drawings & materials to construction team for smooth work flow.
• Ensuring the approved & latest AFC issue to site & shop & controlling the As-Built drawings.
• Assisting Project Manager to prepare Risk Register to forecast Risks in the project & manage / mitigate them as per priority.
• Arranging & Allocating resources - manpower, materials, consumables & equipment in advance as per plan, priority and sequence for smooth operations and to get the planned productivity
• Achieving the given task and scope within the budget and schedule
• Mitigating the plan/schedule if any schedule slippage due to unexpected situations and or critical path activities
• Utilizing the scrap materials for temporary fabrication aids/supports - saving company cost
• Conducting Internal Audit to rectify the weak part of internal departments and supporting to improve the same
• Always maintain good safety & motivate the people for the same - conduct training & TBT
• Liaising & supporting Proposal team in bidding stage for estimation of resources required.
• Liaising with commercial, planning & project team in budget split up & cost code for construction activities to have better control on Cost.
• Reviewing & approving Method Statements & TRA for all construction related activities
• Coordinating with Engineering, QA/QC, HSSE and having good communication at all the time to complete the task with quality, safety & productivity.
• Preparing Punch list for mechanical completion and liaising with Commissioning team
• Performing the job as per International Standards, codes & client specifications (e.g. DNV, AWS, EMMUA, ASME, ADGAS, SAES)
• Continuous monitoring of Consumables, tools, materials & equipment and coordinating with Procurement/warehouse for current & upcoming projects for smooth operations
• Reviewing the daily & weekly progress with Yard manager and taking remedies to improve the productivity and advising the construction team accordingly - Implemented Job Card system
• Preparing Lesson learn Register for all projects and communicate to relevant team to avoid mistakes / taking action for coming projects
• Achieved the given task and scope within the budget and schedule
• Arranged project & aid materials in advance with contingencies and maintain proper record to avoid last minute surprises
• Prepared Method statement for all construction activities
• Deployed right supervisors for the right job
• Prepared Preplanning, estimation & micro schedule for all major activities
• Raised DCR, PCR for any design or scope variance & claimed against client
• Coordinated with all internal departments, subcon & client for good construction flow
• Read the scope of work thoroughly before start job and saved plenty of company cost
• Updated and reported daily & weekly progress reports
• Achieved the given task and scope within the budget and schedule
• Arranged project & aid materials in advance with contingencies and maintain proper record to avoid last minute surprises
• Prepared Method statement for all construction activities
• Monitored and controlled the Materials in good manner as per priority throughout the projects
• Prepared Preplanning, estimation & micro schedule for all major activities
• Raised DCR, PCR for any design or scope variance & claimed against client
• Coordinated with all internal departments, subcon & client for good construction flow
• Read the scope of work thoroughly before start job to avoid any flaw during construction stage
• Reviewed and reported daily & weekly progress reports through work pack
Project management
leading projects
progress reporting and preparing invoices
Preliminary responsible person for all mechanical activities in the Dubai LNG Import Terminal Project as Mechanical Engineer and managed entire project cycle from Engineering to Construction.
• Prepared Method of Statements as per the Clients’ project Management procedures and
International Standards.
• Prepared Permit to work (PTW) for all mechanical kind of activities.
• Erected the piping, valves, flanges and Instruments as per the approved P&ID in the
Offshore Platform as well as Onshore Site.
• Liaised with marine diving team for connecting and testing the subsea pipelines.
• Monitored the complete site activities for the construction of Piping and Pipeline.
• Made and verified Protocols for all flange tightening joints in the project.
• Coordinated with QC Team for inspecting all project materials and getting approvals.
• Prepared Test Pack and check list for Hydrostatic Testing and Pre-commissioning.
• Fabrication done by using the international code ASME sec VIII and B 31.3.
• Monitored and updated the materials usage and welding consumables for construction.
• Engineer -In-charge & permit holder for all mechanical activities in site.
• Conducted monthly Flawless meeting with client for the tightness (FMS).
• Coordinated with Project and Quality departments for completing the project without any issue.
• Coordinated and followed the HSE for safe working condition.
• Worked as a Flange Protocol Manager (FPM) in the flawless team.
• Prepared & Updated the Planning & Project Management chart for Mechanical works
and explain to the client about the job completion.
• Coordinated with Blasting, Coating and Painting team.
• Planned and scheduled the work accordance with the clients’ project procedure.
• Prepared Volume, Man-hour, Man power estimation and material cost assessment for work.
• Involved & completed the task of the Testing, Pre-Commissioning and Commissioning
Start Up with 100% of success.
Preliminary responsible for all mechanical activities in the ONGC Projects as Mechanical
Engineer and managed entire projects from Design to Construction.
• Checked all Equipment’s like Pressure Vessels, Storage Tanks, piping & Pipeline
Design and detailed drawings.
• Responsible for Mechanical Data sheets preparation of Pressure vessels and Tanks
developing equipment narrative specifications.
• Checked and verified Piping & Pipeline drawings and released to shop for fabrication.
• Understanding and applying the Fabrication requirements of ASME Boiler and Pressure
vessel Code Sec VIII.
• Coordinated with the design team and giving the advanced output to the client.
• Modified the design changes in the pipeline routings as per client’s requirements.
• Individually Handled fuel/Oxy Tanks fabrication project and completed without any
quality issue.
• Coordinated with QC and Project Team for completing the project scope within the time period.
• Prepared Test Pack and check list for Testing and Pre-Commissioning.
• Installed the Piping and Pipelines as per approved P&ID.
• Involved in the Agni Missile Vessels fabrication and tested with 0% leakages.
• Completed the Oxy and fuel tank manufacturing within the given time period.
• Reviewed Technical Documents and Prepared Equipment Data sheet.
• Got the safety reward for achieving the safe working at site with 0% accident.
Mechanical Design, New Product Development
Got 70 % with first class with out any history of arrears