Director
Randhawa & Co
Total years of experience :22 years, 0 Months
Hajj and Umrah Tour Operator
Air Ticketing
Telecom Services
Third party hiring contractor
Whole sale agent for Veterinary Medicines and Animal Feeds
Switching and Power Plant maintenance wing established under divisional head and Name of post was re designated from Engineer Operations to Assistant Business Manager.
Duties were to boost up of sales and maintenance of telecomm network along with provisioning and fault rectification
Sub Divisional Officer.
Company management abolished the both posts of Assistant Engineers and created a new post of Engineer Operations.
Switching and OSP combined under one head .
Sales and customer services center also established under different head.
Provisioning of telecomm services, Fault rectification, Sales of company products along with office and staff management were in my responsibilities
Cable Maintenance
Sub Divisional Officer
Provisioning of efficient telecomm services to valued customers and Staff Management
A team of 41 customer support representatives plus technicians and 07 exchanges were in my charge.
During my 03 years stay as Assistant Engineer External Operations, with existing resources I was maintained all underground cable faults and reduced customer complaints from 26% to only 03% percent.
As Assistant Engineer internal switching I was Maintained all fault of switching systems and standby power backup D.G sets, rectifiers and batteries with zero percent breakdown and cleared all pending deficiencies.
46 telephone exchanges and a team of 14 telecomm technicians were in my charge and responsibilities were to maintain the telecomm switching, standby and backup power supply system like D.G sets, rectifiers and batteries.
07 telephone exchanges were in my charge.
04 technicians and 13 CSRs were in my team and responsibilities were to boost up sales and line fault rectification
My duties were management of CSR staff uty roster and to analyze telecomm traffic and grass rout suggestions for betterment of service during peak time along with customer directory updation.
300 customer support representatives were in my charge
Major subject of course were 1- Telecom systems 2- Electrical systems 3- Satellite communication 4- Integrated circuits 5- Computer software and hardware 6- Business & Industrial management
Major subject of course were 1- Study of telecomm switching and access network 2- Study of backup power supplies 3- Radar and satellite communication 4- Integrated circuits 5- Computer software and hardware functions
it was a 6 month course designed for supervision of telecom networks in which studied about 1- Telecom access network like Cooper, optical fiber and wireless 2- Telecom power plant like D.G sets up to 1-MW, inverters , batteries, UPS, rectifiers and transformers. 3- Telecom transmission and signaling systems. 4- Switching and integrated systems. Switching and subscriber administration at RLU,MSU and at IN, MSC and NGN 5- Safety control systems
It was a 3-years course in which studied about Radio and TV transmission techniques. Maintenance and trouble shooting Electricity and distribution Satellite transmission Studio Cameras and operations Industrial uses of semi conductors A.C and D.C motors Lay out designing and survey