مجموع سنوات الخبرة: 29 سنوات, 8 أشهر
ديسمبر 2016
إلى حتى الآن
Project Manager
في Confidential
البلد :
الكويت - الجهرة
Project Manager And Contract Administrator FIDIC Red Book 23 Million Usd
The Works comprise the Construction, Completion and Roads, Utilities, Irrigation Tank Pump Station, Substations and Infrastructure Works
Works including:
All Roads Fresh Water and Fire Fighting Network. - Irrigation Water Network. - Sanitary Water Network. - Storm Water Network- Electrical Infrastructure Works and Telecommunication Work.
Underground water treatment plant, Irrigation Tank and Pump Room
All associated Structural, Architectural, Mechanical and Electrical Works.
Electrical Substation
The Works comprise the Construction, Completion and Roads, Utilities, Irrigation Tank Pump Station, Substations and Infrastructure Works
Works including:
All Roads Fresh Water and Fire Fighting Network. - Irrigation Water Network. - Sanitary Water Network. - Storm Water Network- Electrical Infrastructure Works and Telecommunication Work.
Underground water treatment plant, Irrigation Tank and Pump Room
All associated Structural, Architectural, Mechanical and Electrical Works.
Electrical Substation
أغسطس 2015
إلى أغسطس 2016
Project Manager (PMP Certified) /Sr Project Manager
في Orion contracting company
البلد :
الإمارات العربية المتحدة - أبو ظبي
Construction of factory for producing Chlorine and Caustic soda For Union Chlorine in the Higher Corporation for Specialized Economic Zone “ZonesCorp” ICAD III, employing the latest state-of-the-art membrane technology and Distributed Control System. the work consited
Piling, Roads, Infrastructure, sbstructure, Superstructure, Undergroud Network, Storm Drainage, Pumping Station, Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping,
The plant commercial operation and the installed capacity of the plant is 70 TPD.
Piling, Roads, Infrastructure, sbstructure, Superstructure, Undergroud Network, Storm Drainage, Pumping Station, Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping,
The plant commercial operation and the installed capacity of the plant is 70 TPD.
فبراير 2014
إلى يوليو 2015
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Al Jaber
البلد :
الإمارات العربية المتحدة - أبو ظبي
Al JABER Energy UAE ONSHORE OFFSHORE Project Manager 400 MILLION USD OIL ANN GAS,
Construction infrastructure and Early Civil Work for Zakum Oil field manmade islands this Project is basically Early Civil Works and Infrastructure Development of the newly dredged ZADCO Manmade Islands namely North, Central, West & South.
This Project will pave the way for preceding Island activities like rig movement construction of a harbor area for material loading/unloading, helipad, material storage, office, drilling (plant area, rig access & pad area) and Island facilities (future Projector accommodations & related services).
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping,
Construction infrastructure and Early Civil Work for Zakum Oil field manmade islands this Project is basically Early Civil Works and Infrastructure Development of the newly dredged ZADCO Manmade Islands namely North, Central, West & South.
This Project will pave the way for preceding Island activities like rig movement construction of a harbor area for material loading/unloading, helipad, material storage, office, drilling (plant area, rig access & pad area) and Island facilities (future Projector accommodations & related services).
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping,
فبراير 2013
إلى مارس 2014
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Air Liquide
البلد :
الإمارات العربية المتحدة - رأس الخيمة
Project Manager 100 MILLION USD
Construction of factory For producing AST (Advanced sieve technologies) and pressure Tower for refinery of 60 meter long by 10 meter Diameter for gas production of Oxygen, nitrogen, liquid Nitrogen Liquid Oxygen Argon, Helium By cryogenic process
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Reviewed plans and specs during the schematic design of pre-construction.Coordinated utility service providers according to project schedules.Obtained building and specialty permits from local jurisdictional agencies.
Conducted weekly production and operations contractor meetings, which facilitated stronger communication and
Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues.
Construction of factory For producing AST (Advanced sieve technologies) and pressure Tower for refinery of 60 meter long by 10 meter Diameter for gas production of Oxygen, nitrogen, liquid Nitrogen Liquid Oxygen Argon, Helium By cryogenic process
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Reviewed plans and specs during the schematic design of pre-construction.Coordinated utility service providers according to project schedules.Obtained building and specialty permits from local jurisdictional agencies.
Conducted weekly production and operations contractor meetings, which facilitated stronger communication and
Conducted weekly production and operations contractor meetings, which facilitated stronger communication and the ability to resolve critical issues.
فبراير 2011
إلى مارس 2013
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Kharafi National
البلد :
الإمارات العربية المتحدة - أبو ظبي
Project Manager 200 MILLION USD
Saadiyat island Project Sewage Treatment Plant -main swage pumping station MBR Technology Membrane Bioreactor R.O Technology 78000 m3, /day client ADSSC Abu Dhabi Sewerage Services Company (consortium) Kharafi national & EMIT (Italian)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Saadiyat island Project Sewage Treatment Plant -main swage pumping station MBR Technology Membrane Bioreactor R.O Technology 78000 m3, /day client ADSSC Abu Dhabi Sewerage Services Company (consortium) Kharafi national & EMIT (Italian)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
أكتوبر 2008
إلى سبتمبر 2011
Site Manager
في Suez Degrmont
البلد :
مصر - القاهرة
Project Manager .80.Million.Euro
waste water treatment of Gabal El Asfar Sewage Treatment Plant (300 000m3)/day Client MINISTRY OF HOUSING AND NETWORK, (consortium) Degremont -Arab Contractors (Egypt)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
waste water treatment of Gabal El Asfar Sewage Treatment Plant (300 000m3)/day Client MINISTRY OF HOUSING AND NETWORK, (consortium) Degremont -Arab Contractors (Egypt)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
نوفمبر 2007
إلى سبتمبر 2008
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Suez Degremont
البلد :
الجزائر - قسنطينة
Project Manager 30 Million Euro
Construction Potable Water Treatment Plant Ain Tinn BENI HAROUN transfer. Filter nitrification, Ozone, Activated Carbon, Pulsator, Chlorine (61 000m3 / J) Client Group ADE (consortium) Degremont CGC (Chinese)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Construction Potable Water Treatment Plant Ain Tinn BENI HAROUN transfer. Filter nitrification, Ozone, Activated Carbon, Pulsator, Chlorine (61 000m3 / J) Client Group ADE (consortium) Degremont CGC (Chinese)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
فبراير 2005
إلى فبراير 2007
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Suez Degremont
البلد :
الجزائر - قسنطينة
Project Manager 80 MILLION EURO
Construction Potable Water Treatment Plant of OUED ATHMANIA BENI HAROUN transfer .Filter soils, ozone, activated carbon, Pulsator, Chlorine (262 000m3 / J) Client (ADE). Algérienne des Eaux Consortium Degremont Enka (Turkey)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Construction Potable Water Treatment Plant of OUED ATHMANIA BENI HAROUN transfer .Filter soils, ozone, activated carbon, Pulsator, Chlorine (262 000m3 / J) Client (ADE). Algérienne des Eaux Consortium Degremont Enka (Turkey)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
سبتمبر 2003
إلى أكتوبر 2005
Site Manager
في Suez Degremont
البلد :
لبنان - طرابلس
Project Manager 20 MILLION EURO
Construction of Water Treatment plant city of Tripoli pre-treatment- biogas - Digester - sludge incinerator (300 000m3/day) client (CDR) Council Of Development And Reconstruction (consortium) Degremont BUTEC (Lebanese)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Construction of Water Treatment plant city of Tripoli pre-treatment- biogas - Digester - sludge incinerator (300 000m3/day) client (CDR) Council Of Development And Reconstruction (consortium) Degremont BUTEC (Lebanese)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
أبريل 2001
إلى مايو 2003
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Suez Degremont
البلد :
موريشيوس
Project Manager 80 MILLION Euro
consortium coordinator, construction of Wastewater Treatment
Plant Client: (WASA) Water & Sewage Authority. Digester, Aeration, Settling, tank UV (8870.00m3 per hour) consortium G5 group, GCC, Manser Saxon, IBL (Italian, South Africa, Mauritian)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
consortium coordinator, construction of Wastewater Treatment
Plant Client: (WASA) Water & Sewage Authority. Digester, Aeration, Settling, tank UV (8870.00m3 per hour) consortium G5 group, GCC, Manser Saxon, IBL (Italian, South Africa, Mauritian)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
يونيو 2000
إلى يونيو 2001
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Suez Degremont
البلد :
اليمن - صنعاء
SITE Manager 30 Million Euro
Construction of Sana 'a Wastewater Treatment Plant .Client: (NWSA) National Water & Sewage Authority 60 000m3 / d Degremont group VINCI (DUMEZ GTM) (French)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Construction of Sana 'a Wastewater Treatment Plant .Client: (NWSA) National Water & Sewage Authority 60 000m3 / d Degremont group VINCI (DUMEZ GTM) (French)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
فبراير 1999
إلى فبراير 2000
Project Manager / Sr.Project Manager / Avp Projects (Building Projects)
في Dumez GTM VINCI
البلد :
اليمن - صنعاء
Civil Engineering Construction waste water treatment plants Sana’a 'VINCI Degremont (JWG DUMEZ) Client: (NWSA) 60 000m3 / d
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
يناير 1999
إلى ديسمبر 1999
Site Manager
في Dumez GTM Vinci
البلد :
المملكة العربية السعودية - الرياض
Construction of a highway Road
Construction Coordinator, QS, Planning Engineer, Claim Coordinator 36 Million USD(7) connection MAIDANI AL MALAK ROYAL PALACE OF DARIAY Client: ARiyadh Development Authority (ADA)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Construction Coordinator, QS, Planning Engineer, Claim Coordinator 36 Million USD(7) connection MAIDANI AL MALAK ROYAL PALACE OF DARIAY Client: ARiyadh Development Authority (ADA)
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
مارس 1998
إلى مارس 1999
Site Manager
في VINCI DUMEZ GTM
البلد :
المملكة العربية السعودية - جدة
Site MANAGER, 13 Million USD
Electrical connection for the pump station Project storm water drainage rainwater 5x5 m3 / second Client: (Ministry of Municipal and Rural Affairs.)
Electrical connection for the pump station Project storm water drainage rainwater 5x5 m3 / second Client: (Ministry of Municipal and Rural Affairs.)
فبراير 1994
إلى فبراير 1998
Project Coordinator Operation and maintenance Manager
في Dumez GTM VINCI
البلد :
المملكة العربية السعودية - جدة
Operations and Maintenance Manager 10 Million USD
Storm water drainage plant of the city of Jeddah, Client (Ministry of Municipal and Rural Affairs.)
1994-1996 VINCI (DUMEZ GTM) Jeddah Saudi Arabia
Project Engineer, 120Million USD
Reviewed plans and specs during the schematic design of pre-construction., construction of Coordinated utility service providers according to project schedules. Storm Water Drainage Project Jeddah, Client (Ministry of Municipal and Rural Affairs) Construction of 13 km of reinforced concrete box culvert 6.90 meters by 3.60 meters Construction of pumping station capacity of 25 m3 per second
Under ground Utilities, Roads Technical Coordinator, local administrative authorities (Ministry of Water Municipality Ministry of PTT Communications • Ministry of Electricity, Ministry of transport, ) etc..
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping
Storm water drainage plant of the city of Jeddah, Client (Ministry of Municipal and Rural Affairs.)
1994-1996 VINCI (DUMEZ GTM) Jeddah Saudi Arabia
Project Engineer, 120Million USD
Reviewed plans and specs during the schematic design of pre-construction., construction of Coordinated utility service providers according to project schedules. Storm Water Drainage Project Jeddah, Client (Ministry of Municipal and Rural Affairs) Construction of 13 km of reinforced concrete box culvert 6.90 meters by 3.60 meters Construction of pumping station capacity of 25 m3 per second
Under ground Utilities, Roads Technical Coordinator, local administrative authorities (Ministry of Water Municipality Ministry of PTT Communications • Ministry of Electricity, Ministry of transport, ) etc..
Piling, Roads, Infrastructure, substructure, Superstructure, Underground Network, Storm Drainage, Pumping Station, Water treatment Plant Admin Building, Steel Structure, Fit Out, Industrial Mechanical, Electrical, Piping